FIELD: building technique, particularly for forming barriers on the path of creeping landslide.
SUBSTANCE: method involves creating ground prism in front of creeping landslide by incandescing metal netting and placing metal netting on the path of landslide movement; installing netting in supports and posts; gradual moving netting upwards above ground level; connecting netting to electric power source for creating thermal field; drying and sintering clay ground by thermal field.
EFFECT: increased efficiency, reduced labor consumption and time of landslide stabilization.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
ANTI- LANDSLIDE STRUCTURE FOR EARTHWORK SLOPES AND INCLINES STABILIZATION | 2002 |
|
RU2229560C2 |
TECHNOLOGY TO STABILISE SLIDE SLOPES WITH STREAMLINED DEWATERING WELLS | 2010 |
|
RU2421573C1 |
SLUMP SLOPE REINFORCEMENT METHOD | 2007 |
|
RU2340729C1 |
METHOD TO STRENGTHEN LANDSLIDE-HAZARDOUS BOARDS OF OPENCAST MINES | 2010 |
|
RU2449088C2 |
METHOD FOR STRENGTHENING OF SLOPES AND SLOT MAKER FOR ITS REALISATION | 2008 |
|
RU2371547C1 |
METHOD FOR PREVENTION OF LANDSLIP FORMATION | 2011 |
|
RU2468146C1 |
ABUTMENT OF BRIDGE | 1998 |
|
RU2136807C1 |
ANTI-LANDSLIDE STRUCTURE FOR REINFORCEMENT OF ROAD EMBANKMENTS ON UNSTABLE SLOPES | 2019 |
|
RU2728046C1 |
GROUND SLOPE OR HILLSIDE CONSOLIDATION METHOD | 2007 |
|
RU2345194C1 |
STRUCTURE FOR CONSOLIDATION OF SLOPES | 0 |
|
SU1671777A1 |
Authors
Dates
2004-07-20—Published
2002-11-15—Filed