FIELD: mining industry.
SUBSTANCE: method includes opening of deposit up to lowest horizon, preparation and extraction of deposit by coaxial chambers in ascending order with forming stable geomechanical system by means of constructing inter-chamber, combined barrier blocks and closing of remaining hollows by means of liquidating filler. Therefore, deposit at bounds with water-isolating ceiling is last to be extracted . Inter-axis space even at all levels is selected on basis of condition, that space between chambers of higher floor is no greater than maximum allowed stable width, and on lower level space is no less than minimal allowed technological width.
EFFECT: lesser possibility of waters influx into mines and reliable support of above-lying rocks and earth surface.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
SALINA DEVELOPMENT METHOD | 2009 |
|
RU2438017C2 |
METHOD OF SALT DEPOSIT MINING | 2001 |
|
RU2206745C1 |
METHOD OF MINING OF SALINE DEPOSITS | 2002 |
|
RU2209971C1 |
METHOD FOR EXTRACTION OF STEEP-FALLING DEPOSITS OF AVERAGE MASSIVENESS | 2004 |
|
RU2254474C1 |
METHOD FOR EXTRACTION OF STEEP-DROPPING DEPOSITS OF AVERAGE MASSIVENESS | 2004 |
|
RU2254473C1 |
DEVELOPMENT METHOD FOR STEEP AND INCLINED DEPOSIT HAVING LOW AND MEDIUM THICKNESS | 2005 |
|
RU2322583C2 |
METHOD FOR EXTRACTION OF STEEP-FALLING AND SLANTING DEPOSITS OF LOW AND AVERAGE POWER | 2003 |
|
RU2247244C1 |
METHOD FOR EXTRACTION OF STEEP-DROPPING AND SLANTING DEPOSITS OF LOWE AND AVERAGE MASSIVENESS | 2004 |
|
RU2254467C1 |
METHOD OF MINING STEEP SLOPING ORE BODIES | 0 |
|
SU720161A1 |
METHOD OF SALT DEPOSIT MINING | 2002 |
|
RU2215146C1 |
Authors
Dates
2004-09-10—Published
2003-04-03—Filed