FIELD: mining industry.
SUBSTANCE: method includes drilling of two or more wells, casing of these, equipping with operation pipes, feeding of dissolvent and non-dissolvent into deposit, draining brine, forming of preparatory mines, washout of chamber. During drilling of wells components of forces in deposit are measured. Washout of chamber is performed above ceiling placed at depth, where all components of forces are equal. Relation of distance between axes of dissolving chambers and chambers diameters are determined from B/D<5, where B - distance between axes of dissolving chambers, in meters, D - diameter of chambers of dissolving, in meters. Loss of non-dissolvent is supported proportional to change of chamber volume. On mouth armature of wells counter-pressure is created for controlling speed of changing of chambers volumes.
EFFECT: higher salt yield during operational extraction of dissolving chambers resources, as well as constant decrease of dissolving chambers volume.
1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTING SALTS FROM SALT DEPOSITS | 2002 |
|
RU2229591C1 |
PROCESS OF UNDERGROUND DISSOLUTION OF SALT DEPOSITS | 2002 |
|
RU2224104C1 |
METHOD FOR UNDERGROUND DISSOLUTION OF SALT DEPOSITS | 2003 |
|
RU2236578C1 |
METHOD OF EXTRACTING WASTES FROM UNDERGROUND CHAMBERS | 2009 |
|
RU2424968C1 |
METHOD OF FORMING RESERVOIRS IN ROCK SALT FORMATIONS AND DEVICE TO THIS END | 2011 |
|
RU2477702C2 |
METHOD OF FORMATION OF UNDERGROUND RESERVOIRS IN BEDS OF ROCK SALT | 2008 |
|
RU2357076C1 |
METHOD OF MINING SALTS BY UNDERGROUND LEACHING THROUGH WELLS | 0 |
|
SU1305314A1 |
METHOD OF SALT MINING FROM SALT DEPOSITS THROUGH DRILLING WELL | 0 |
|
SU803543A1 |
METHOD FOR CREATING UNDERGROUND RESERVOIRS IN ROCK-SALT FORMATIONS | 2003 |
|
RU2236579C1 |
METHOD OF BRINE PRODUCTION | 2002 |
|
RU2212531C1 |
Authors
Dates
2004-09-20—Published
2003-05-05—Filed