FIELD: transport.
SUBSTANCE: invention relates to making underground reservoirs in rock salt formations. Reservoir is profiled using concentrically arranged tubes to lift brine, feed water and production pipes. Thereafter, water feed pipe is withdrawn to feed water feed column composed of flexible water feed pipe. Then, reservoir shape is corrected by feeding solvent at reservoir correction point via gap between brine lift tube and flexible water feed pipe of said column. Additionally, device comprises water feed column with flexible water feed pipe ropes arranged in symmetry about is cross-section and passed through rings rigidly secured to flexible pipe at regular spacing to connect flexible pipe bottom end with auxiliary winches.
EFFECT: expanded operating performances.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CORRECTING RESERVOIR SHAPE IN ROCK SALT FORMATIONS | 2011 |
|
RU2465448C1 |
METHOD OF FORMATION OF UNDERGROUND RESERVOIRS IN BEDS OF ROCK SALT | 2008 |
|
RU2357076C1 |
METHOD FOR CREATING UNDERGROUND RESERVOIRS IN ROCK-SALT FORMATIONS | 2003 |
|
RU2236579C1 |
METHOD OF EXTRACTING WASTES FROM UNDERGROUND CHAMBERS | 2009 |
|
RU2424968C1 |
METHOD OF BRINE PRODUCTION | 2002 |
|
RU2212531C1 |
BRINE PRODUCTION METHOD | 2006 |
|
RU2306413C1 |
METHOD FOR UNDERGROUND DISSOLUTION OF SALT DEPOSITS | 2003 |
|
RU2236578C1 |
METHOD FOR CREATING UNDERGROUND RESERVOIRS IN ROCK SALT FORMATIONS AND UNDERGROUND RESERVOIR DESIGNS FOR IMPLEMENTING THE SAME | 1991 |
|
RU2068805C1 |
METHOD FOR CONSTRUCTING UNDERGROUND VESSELS IN ROCK SALT DEPOSITS | 2023 |
|
RU2815404C1 |
PROCESS OF UNDERGROUND DISSOLUTION OF SALT DEPOSITS | 2002 |
|
RU2224104C1 |
Authors
Dates
2013-03-20—Published
2011-05-10—Filed