FIELD: mining industry.
SUBSTANCE: method includes drilling vertical well in salt deposit, casing of well, equipping well with concentrically placed brine-hoisting, water-feeding and operation pipes, feeding of dissolvent along inter-pipe space between water-feeding and brine-hoisting pipes. Along inter-pipe space between water-feeding and operation pipes a non-dissolvent is fed under pressure, preparatory mine is formed, salt in upper portion of reservoir is effected along perimeter by tangentially directed dissolvent jets and brine is extracted through brine-hoisting pipe. After forming of preparatory mine additional pipe is inserted into the well, lower end of which before lowering into mine is perforated along the length equal to reservoir height, and an elastic sealed cover is fixed on that portion. After that along the space between additional and brine-hoisting pipe into elastic sealed cover dissolvent is fed in volume equal to amount of extracted salt. Maximum volume of elastic sealed cover is selected equal to projected volume of reservoir.
EFFECT: faster process of underground reservoirs construction, higher speed of wall-adjacent flows, lower energy costs due to lesser number of saturation cycles.
1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMATION OF UNDERGROUND RESERVOIRS IN BEDS OF ROCK SALT | 2008 |
|
RU2357076C1 |
METHOD OF EXTRACTING WASTES FROM UNDERGROUND CHAMBERS | 2009 |
|
RU2424968C1 |
METHOD OF FORMING RESERVOIRS IN ROCK SALT FORMATIONS AND DEVICE TO THIS END | 2011 |
|
RU2477702C2 |
METHOD OF BRINE PRODUCTION | 2002 |
|
RU2212531C1 |
METHOD FOR UNDERGROUND DISSOLUTION OF SALT DEPOSITS | 2003 |
|
RU2236578C1 |
BRINE PRODUCTION METHOD | 2006 |
|
RU2306413C1 |
METHOD FOR CONSTRUCTING UNDERGROUND VESSELS IN ROCK SALT DEPOSITS | 2023 |
|
RU2815404C1 |
METHOD FOR CREATING UNDERGROUND RESERVOIRS IN ROCK SALT FORMATIONS AND UNDERGROUND RESERVOIR DESIGNS FOR IMPLEMENTING THE SAME | 1991 |
|
RU2068805C1 |
DEVICE FOR CORRECTING RESERVOIR SHAPE IN ROCK SALT FORMATIONS | 2011 |
|
RU2465448C1 |
PROCESS OF UNDERGROUND DISSOLUTION OF SALT DEPOSITS | 2002 |
|
RU2224104C1 |
Authors
Dates
2004-09-20—Published
2003-07-02—Filed