FIELD: mining.
SUBSTANCE: method includes development of reserves from a border of an extraction column, drilling from surface of wells into the extraction column and primary setting of the roof. Wells are drilled to the rated line of the roof arch in one row in parallel to a stoping face in the middle part of the limit span of the main roof slab. Eutectic-hard-freezing solutions are filled into wells for the height of 1.5-2 m, rated time is maintained, which is required for melting of ice in cracks of roof rocks and formation of germinal slots, afterwards the wells are filled to the surface with the same solutions, and a hydraulic rupture is carried out in a rock massif.
EFFECT: invention makes it possible to ensure controlled primary setting of strong cracked rocks.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPING A THICK SEAM WITH TOUGH COAL AND DIFFICULT ROOFING ROCKS | 2023 |
|
RU2799293C1 |
METHOD FOR DEGASSING ACCOMPANYING SEAMS | 1994 |
|
RU2065973C1 |
METHOD FOR CONTROLLING HARD-DESTRUCTIBLE CEILING UNDER CONDITIONS OF PERMAFROST | 2002 |
|
RU2237809C2 |
PROCEDURE FOR WEAKENING MARGINAL MASSIF OF MINE WORKINGS AT DEVELOPMENT OF COAL BEDS | 2009 |
|
RU2396429C1 |
METHOD OF DRAINAGE OF SATELLITE SEAMS | 0 |
|
SU1693264A1 |
COMPLEX METHOD OF PRELIMINARY DEGASSING OF WORKING COAL BED, WORKED-OUT AREA AND ACCOMPANYING BEDS AND CONTROLLED CAVING OF HEAVY ROOF | 2013 |
|
RU2540750C2 |
METHOD OF RELIEF OF WORKING MARGINAL ROCK MASS AND SHAPED CHARGE FOR FORMATION OF INITIAL FISSURES | 1994 |
|
RU2078927C1 |
METHOD FOR CONTROLLING HARD-TO-COLLAPSE ROOF | 0 |
|
SU1643718A1 |
METHOD FOR DEVELOPMENT OF SERIES OF CONTIGUOUS BEDS OF CRYOLITHIC ZONE COAL | 2011 |
|
RU2478787C2 |
METHOD FOR ROOF ROCK DISPLACEMENT MEASUREMENT IN PERMAFROST ZONE CIRCUMSTANCES | 2006 |
|
RU2310750C2 |
Authors
Dates
2013-04-10—Published
2011-09-16—Filed