FIELD: oil extractive industry.
SUBSTANCE: inter-pipe space of well is filled with anti-corrosion liquid and said liquid is pressed into well-adjacent space and into pit-face area of well along inter-tubular space. Technological delay, discharge and creation of pressure is performed along inter-tubular space. During well operation inter-tubular space is used as reservoir for storing and using anti-corrosion liquid. Anti-corrosion liquid is gradually fed from inter-tubular space into well-adjacent space and into pit-face area. As anti-corrosion liquid compound on basis of phosphate diammonium is used.
EFFECT: higher efficiency.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CLEANING FACE-ADJACENT BED AREA | 2003 |
|
RU2246610C1 |
FLOW OUT METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF PRESSURE WELL | 2008 |
|
RU2366807C1 |
METHOD OF WELL OPERATION | 2007 |
|
RU2335624C1 |
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF THE WELL | 2019 |
|
RU2708647C1 |
METHOD TO PREVENT CORROSION CAUSED BY SULFATE-REDUCING BACTERIA | 2004 |
|
RU2263201C1 |
WELL OPERATION METHOD | 2009 |
|
RU2399758C1 |
METHOD FOR PREVENTING CORROSION CAUSED BY SULFATE-RESTORING BACTERIA | 2003 |
|
RU2233973C1 |
METHOD OF REAGENT DEMUDDING OF WELLS | 1997 |
|
RU2120546C1 |
METHOD FOR WELL REPAIR | 2008 |
|
RU2354802C1 |
METHOD OF HIGH-VISCOCITY OIL PRODUCTION | 2002 |
|
RU2206728C1 |
Authors
Dates
2004-11-10—Published
2003-12-03—Filed