FIELD: oil and gas industry.
SUBSTANCE: in well operation method involving pumping of composite material to the formation to the interval below oil-water contact, process exposure and operation of the well, there preliminarily performed is forcing of water from inter-tube space with oil to the interval below oil-water contact; in order to prepare composite material the thickener is filled to inter-tube space of the well on the basis of 1-5 kg per 1 m3 of oil located in inter-tube space, and mixing of thickener with oil in inter-tube space by oil circulation with thickener via tubing string and inter-tube space, and pumping of solution of oil and thickener from inter-tube space to the interval below oil-water contact is performed in pulse mode under pressure exceeding hydrostatic one by not more than 10%; at that after process exposure the well operation is performed during the first 5-15 days in moderate mode with flow rate of not more than 50% of the operating one.
EFFECT: reducing associated water production.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL RECOVERY INTENSIFICATION | 2001 |
|
RU2204702C2 |
METHOD FOR WATER INFLUX ISOLATION OF OIL WELL | 2015 |
|
RU2593279C1 |
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF THE WELL | 2019 |
|
RU2708647C1 |
METHOD FOR INTER-WELL FLUID PUMPING | 2012 |
|
RU2503805C1 |
WELL DEWAXING METHOD | 2014 |
|
RU2553129C1 |
ISOLATION METHOD OF WATER INFLUX TO WELL | 2010 |
|
RU2425957C1 |
METHOD FOR INTER-WELL TRANSIT OF LIQUID | 2005 |
|
RU2290500C1 |
WELL OPERATION METHOD | 2010 |
|
RU2425963C1 |
METHOD FOR DEVELOPING SUPERVISCOUS OIL DEPOSITS | 2023 |
|
RU2803344C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN A PETROLEUM PRODUCTION BOREHOLE FROM AN UNDERLYING AQUIFER | 2021 |
|
RU2776018C1 |
Authors
Dates
2010-09-20—Published
2009-10-05—Filed