FIELD: oil extractive industry.
SUBSTANCE: method includes pumping working agent through force wells, extracting oil through extracting wells and leading electric current to deposit. Current us led to deposit along a couple of wells. Through one well alternating or impulse current is led into deposit via electrodes. These are used in form of perforator drill excluding electrical short circuit with casing column and are led outside casing column of well into bed through additionally formed perforation apertures and left in perforation apertures. In other well zero phase of current source is connected to casing column.
EFFECT: higher oil yield.
1 ex
Title | Year | Author | Number |
---|---|---|---|
PRODUCTION METHOD OF OIL, NATURAL GAS AND GAS CONDENSATE BY THEIR ELECTROMAGNETIC RESONANT DISPLACEMENT FROM PRODUCTIVE FORMATION | 2010 |
|
RU2425962C1 |
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2008 |
|
RU2347068C1 |
METHOD OF PRODUCING FORMATION DEVELOPMENT | 2001 |
|
RU2206724C2 |
PLANT FOR TREATMENT OF PRODUCING FORMATION | 1992 |
|
RU2049914C1 |
METHOD FOR OIL DEVELOPMENT WITH HORIZONTAL WELLS | 2014 |
|
RU2539486C1 |
METHOD FOR EXTRACTING DEPOSIT OF HIGH VISCOSITY OIL OR BITUMEN | 2005 |
|
RU2287679C1 |
METHOD FOR EXTRACTING HETEROGENEOUS OIL-BITUMEN DEPOSIT | 2005 |
|
RU2287678C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2540714C1 |
METHOD TO HEAT INJECTION FLUID IN WELL BORE TO DISPLACE OIL FROM BED | 2010 |
|
RU2450121C1 |
METHOD OF OIL RECOVERY AT LATE STAGES OF OIL DEPOSIT DEVELOPMENT AND DEVICE ITS EMBODIMENT | 1998 |
|
RU2175377C2 |
Authors
Dates
2004-11-27—Published
2003-11-11—Filed