FIELD: oil industry, possible use during extraction of deposit of high viscosity and bituminous oil.
SUBSTANCE: in accordance to method during extraction of heterogeneous oil-bitumen deposit, extracting two-mouth horizontal well is built. Above extracting two-mouth horizontal well in parallel two it forcing two-mouth horizontal well is built, thus forming a pair of two-mouth horizontal wells. At adjacent section of deposit, analogical pair of two-mouth horizontal wells is built. Pairs of two-mouth horizontal wells are driven separately, enveloping most productive deposit zones. Modes of operation of pairs of two-mouth horizontal wells on extraction are set with consideration of special features of each section of deposit. Forcing of heat carrier is performed into upper forcing two-mouth horizontal wells from both mouths. Extraction of product from product two-mouth horizontal wells is performed using swab pump, while swab pumps of adjacent product two-mouth horizontal wells are connected to each other.
EFFECT: increased oil yield coefficient and increased coverage of bed by thermal effect and displacement.
1 ex, 1 tbl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTING OIL-BITUMEN DEPOSIT | 2005 |
|
RU2287677C1 |
METHOD AND DEVICE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT BY USING TWO-HEAD HORIZONTAL WELLS | 2009 |
|
RU2410534C1 |
DEVELOPMENT METHOD OF HEAVY OIL OR BITUMEN MINE FIELD WITH USE OF DOUBLE-HEAD HORIZONTAL WELLS | 2010 |
|
RU2429345C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH IMPLEMENTATION OF TWO WELL HEAD HORIZONTAL WELLS | 2010 |
|
RU2431745C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH IMPLEMENTATION OF DOUBLE WELL HEAD HORIZONTAL WELLS | 2010 |
|
RU2431746C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH CONTROL OVER WITHDRAWAL OF WELL PRODUCTION | 2009 |
|
RU2412343C1 |
METHOD AND DEVICE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT WITH CONTROL OF WELL PRODUCTION DRAWDOWN | 2009 |
|
RU2398103C1 |
PROCEDURE FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH CONTROL OF PUMPING HEAT CARRIER INTO WELL | 2009 |
|
RU2412342C1 |
DEVELOPMENT METHOD OF HEAVY OIL OR BITUMEN MINE FIELD WITH CONTROL OF WELL PRODUCTION EXTRACTION | 2009 |
|
RU2413068C1 |
DEVELOPMENT METHOD OF HEAVY OIL OR BITUMEN MINE FIELD WITH CONTROL OF HEAT CARRIER PUMPED TO WELL | 2009 |
|
RU2418159C1 |
Authors
Dates
2006-11-20—Published
2005-12-16—Filed