FIELD: oil industry, possible use for extracting deposits of high viscosity oil or bitumen.
SUBSTANCE: in accordance to method, a row of parallel extractive two-mouth horizontal wells is built. Above the row of parallel extractive two-mouth horizontal wells, in parallel to it, a row of forcing parallel two-mouth horizontal wells is built with position between extracting wells in plane of force wells. Water steam is forced through a row of parallel force two-mouth horizontal wells with forcing of steam through both mouths of each one of forcing two-mouth horizontal wells. Product is extracted through a row of parallel product two-mouth horizontal wells. In gaps between product and forcing two-mouth horizontal wells flat-lying force wells are built, through which dissolvent of high viscosity oil or bitumen is forced.
EFFECT: increased pace of warming-up and of oil extraction.
1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTING HETEROGENEOUS OIL-BITUMEN DEPOSIT | 2005 |
|
RU2287678C1 |
METHOD FOR EXTRACTING OIL-BITUMEN DEPOSIT | 2005 |
|
RU2287677C1 |
METHOD FOR EXTRACTING LAYER-ZONE-WISE HETEROGENEOUS FORMATION OF HIGHLY VISCOUS OIL OR BITUMEN | 2006 |
|
RU2295030C1 |
DEVELOPMENT METHOD OF DEPOSIT OF HIGH-VISCOSITY OIL OR BITUMEN | 2011 |
|
RU2485304C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL DEPOSIT AT THERMAL EFFECT | 2011 |
|
RU2461705C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH IMPLEMENTATION OF TWO WELL HEAD HORIZONTAL WELLS | 2010 |
|
RU2431745C1 |
DEVELOPMENT METHOD OF HEAVY OIL OR BITUMEN MINE FIELD WITH USE OF DOUBLE-HEAD HORIZONTAL WELLS | 2010 |
|
RU2429345C1 |
METHOD AND DEVICE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT BY USING TWO-HEAD HORIZONTAL WELLS | 2009 |
|
RU2410534C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH CONTROL OVER WITHDRAWAL OF WELL PRODUCTION | 2009 |
|
RU2412343C1 |
HIGHLY VISCOUS OIL FIELDS PRODUCTION METHOD | 2008 |
|
RU2379494C1 |
Authors
Dates
2006-11-20—Published
2005-12-16—Filed