FIELD: building materials, particularly for hydraulic and industrial building, namely for creating ground-filled structures, that is embankments, dams, highways, piles and so on, and bases thereof.
SUBSTANCE: ground-fill composition based on mixture including carbon, fluorides and oxides, fluorine salts and sodium salts comprises sludge deposits formed during aluminum production in the following amounts: free and bound carbon - 7,0 - 70,0 % by weight, fluorides and fluorine salts in amount of 5,0 - 40,0 % by weight, aluminum oxide - 2,0 - 40,0 % by weight, sodium oxide and salts - 3,0 - 30,0 % by weight, remainder (ferric oxide, silicon oxide, gummy, bound water and so on) - 1,0 - 20,0 % by weight.
EFFECT: possibility to utilize waste, improved ecology and reduces cost.
1 ex
Title | Year | Author | Number |
---|---|---|---|
COMPOSITION FOR EARTH-FILLED STRUCTURE AND EARTH-FILLED STRUCTURE BASE ERECTION IN CIVIL, INDUSTRIAL AND HYDRAULIC CONSTRUCTION INDUSTRIES | 2005 |
|
RU2316628C2 |
COMPOUND INTENDED FOR ERECTING SOIL ROCK-FILL AND ARTIFICIAL CONSTRUCTIONS AND FOUNDATIONS FOR ROCK-FILL, ARTIFICIAL AND OTHER CONSTRUCTIONS USED IN INDUSTRIAL CONSTRUCTION AND WATER ENGINEERING | 2007 |
|
RU2340728C1 |
COMPOSITION TO CONSTRUCT EARTH-FILLED STRUCTURES AND BASES FOR FILLED SLUDGE DUMPS IN ALUMINOUS MATERIAL PRODUCTION | 2005 |
|
RU2288321C1 |
METHOD FOR DAM AND OTHER FILL STRUCTURE CONSTRUCTION | 2003 |
|
RU2275461C2 |
METHOD OF ACHIEVING OF REINFORCED GRAVEL MATERIAL | 2006 |
|
RU2324784C1 |
ALUMINIUM PRODUCTION SLUDGE DISPOSAL METHOD | 2016 |
|
RU2620844C1 |
METHOD TO EXTEND TAILING DUMPS | 2013 |
|
RU2542146C2 |
METHOD FOR ERECTION OF EARTHFILL STRUCTURE, OF DAM TYPE WITH INSPECTION PATH ON SOFT GROUND | 2008 |
|
RU2366782C1 |
INSULATING MATERIAL FOR SLURRY STORAGES OF INDUSTRIAL WASTES | 2013 |
|
RU2544382C1 |
METHOD FOR TREATING DRILLING WASTE | 2020 |
|
RU2767535C1 |
Authors
Dates
2004-12-20—Published
2003-07-24—Filed