FIELD: hydraulic and industrial building, particularly to create fill ground structures, dams, motor roads, stacks and bases thereof.
SUBSTANCE: method involves preparing base for dam erection; filling dam body with ground and compacting thereof. The ground material is sludge taken from aluminum waste sludge storage facility and consists of electric filter dust and residues of gas cleaning and flotation operations. The sludge is prepared by dewatering thereof to obtain 0.4-0.5 humidity. Then the sludge is compacted to provide porosity of not more than 0.60.
EFFECT: provision of aluminum waste utilization, reduced costs.
3 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
COMPOSITION FOR ERECTING GROUND-FILL STRUCTURES AND BASES THEREOF | 2003 |
|
RU2242562C1 |
COMPOUND INTENDED FOR ERECTING SOIL ROCK-FILL AND ARTIFICIAL CONSTRUCTIONS AND FOUNDATIONS FOR ROCK-FILL, ARTIFICIAL AND OTHER CONSTRUCTIONS USED IN INDUSTRIAL CONSTRUCTION AND WATER ENGINEERING | 2007 |
|
RU2340728C1 |
METHOD TO EXTEND TAILING DUMPS | 2013 |
|
RU2542146C2 |
COMPOSITION TO CONSTRUCT EARTH-FILLED STRUCTURES AND BASES FOR FILLED SLUDGE DUMPS IN ALUMINOUS MATERIAL PRODUCTION | 2005 |
|
RU2288321C1 |
COMPOSITION FOR EARTH-FILLED STRUCTURE AND EARTH-FILLED STRUCTURE BASE ERECTION IN CIVIL, INDUSTRIAL AND HYDRAULIC CONSTRUCTION INDUSTRIES | 2005 |
|
RU2316628C2 |
METHOD OF ACHIEVING OF REINFORCED GRAVEL MATERIAL | 2006 |
|
RU2324784C1 |
METHOD FOR SALT DUMP AND MUD PIT CONSTRICTION IN SINGLE AREA | 2006 |
|
RU2316651C1 |
METHOD OF ERECTING PRESSURE DAM ON WEAK FLOODED FOUNDATION | 0 |
|
SU1758141A1 |
METHOD OF JOINT CONSTRUCTION AND RESTORATION OF TAILING DUMPS | 2006 |
|
RU2335631C2 |
METHOD OF FORMING DUMP | 2016 |
|
RU2667395C2 |
Authors
Dates
2006-04-27—Published
2003-05-26—Filed