FIELD: oil and gas extractive industry.
SUBSTANCE: method includes forcing of large volumes of composition with adjustable gel-forming time into bed through force wells, and as gel-forming compound zeolite or hydrochloric acid are used. After pumping of 0.4…0.9 volume of gel-forming solution day gel-forming composition is formed consisting of five consecutive margins: hydrochloric acid water solution margin with mass concentration 15%, fresh water margin, gel-forming compound margin, containing wastes of filaments or fibers of polyacrylonitrile, margins of fresh water and margin of water solution of hydrochloric acid with mass concentration 15%. Volume of day gel-forming composition is (0.05…0.6)q with relation 2:1:2 of volumes of margins of water solution of hydrochloric acid, fresh water and gel-forming compound on basis of hyvpan (q - volume of day share of gel-forming compound of basis of zeolite, m3/day). Then forcing by draining water is performed in volume, equal two day volume of gel-forming solution on basis of zeolite, and well is stopped for technological pause. Forcing of remaining gel-forming solution on basis of zeolite is performed. Gel-forming solution is forced into bed by draining water in volume, equal to volume of day force share, then well is stopped again for technological pause. Gel-forming time of first margin of remaining volume is calculated from given formula.
EFFECT: higher efficiency.
3 cl, 2 ex, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
FORMATION PERMEABILITY CONTROL METHOD | 2003 |
|
RU2262584C2 |
METHOD FOR ADJUSTING EXTRACTION OF NON-HOMOGENOUS OIL BED | 2002 |
|
RU2249099C2 |
METHOD OF PRODUCTIVE STRATUM TREATMENT WITH WATER SHUT-OFF AGENT | 2008 |
|
RU2374425C1 |
FORMATION PERMEABILITY CONTROL METHOD | 2009 |
|
RU2453691C2 |
METHOD FOR CONTROLLING PERMEABILITY OF NOT UNIFORM OIL DEPOSIT | 2002 |
|
RU2224879C1 |
HETEROGENEOUS PETROLEUM LAYER DEVELOPMENT GOVERNING METHOD | 2002 |
|
RU2224092C1 |
METHOD OF FORMATION PERMEABILITY CONTROL | 1999 |
|
RU2148160C1 |
METHOD OF DEVELOPMENT OF FLOATING OIL POOL | 1994 |
|
RU2076203C1 |
WATER-FLOODED OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2475635C1 |
DEVELOPMENT METHOD OF WATER-FLOODED OIL DEPOSIT | 2018 |
|
RU2693101C1 |
Authors
Dates
2004-12-27—Published
2002-09-17—Filed