FIELD: building, particularly for building railroad embankments in permafrost zones.
SUBSTANCE: groove includes ballast prism, support massif contacting with groove slopes by side massif walls and arranged under ballast prism, heat insulation layer laid on groove slopes and protective layer located above heat insulation one. Support body comprises upper part of hU height formed of fractional rock and lower part of hL height made of non-drainage ground. Protective layer is made of drainage ground. Support massif height h0, upper part height hU and lower part hL height are determined from corresponding relations.
EFFECT: prevention of road bed deformation during embankment erection.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
ROAD EMBANKMENT BUILT ON PERMAFROST GROUND | 2004 |
|
RU2256032C1 |
ROAD EMBANKMENT BUILT ON PERMAFROST GROUND | 2004 |
|
RU2256031C1 |
PERMAFROST ROAD FILL | 2020 |
|
RU2744541C1 |
WATER DRAINAGE DITCH | 2003 |
|
RU2245957C1 |
ROAD EMBANKMENT WITH DRAINAGE GROOVE | 2003 |
|
RU2245965C1 |
SHALLOW TUNNEL FORMED IN PERMAFROST GROUND | 2004 |
|
RU2275471C1 |
ROAD EMBANKMENT ON PERMAFROST | 2018 |
|
RU2705656C1 |
ROAD EMBANKMENT MADE ON PERMAFROST GROUND | 2005 |
|
RU2278213C1 |
EARTH STRUCTURE BUILT ON PERMAFROST GROUND | 2003 |
|
RU2256030C2 |
SHALLOW TUNNEL FORMED IN PERMAFROST GROUND | 2004 |
|
RU2275472C1 |
Authors
Dates
2005-01-20—Published
2003-10-06—Filed