FIELD: building, particularly to erect building structures in permafrost areas and thick snow cover.
SUBSTANCE: tunnel comprises trench in which load-bearing enclosing structure partly submersed in ground below natural ground surface is arranged. The enclosing structure defines space for transport passage structure location. Nonfrost-susceptible ground layer is arranged under the passage structure. Total height of the nonfrost-susceptible ground layer between passage structure bottom and lower trench surface is to be not less than season thawing depth. Ground prism is created above natural ground surface having axis coinciding with tunnel axis. Width B of ground prism determined along trench top, ground prism width Bp, ground prism height he at edges thereof and ground prism height ha along structure axis are determined from given correlations.
EFFECT: reduced costs of motor road and rail road erection in permafrost ground and increased ability of ground retaining in permafrost condition.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
SHALLOW TUNNEL FORMED IN PERMAFROST GROUND | 2004 |
|
RU2275472C1 |
WATER CONSTRUCTION IN ROAD BANK ON PERMAFROSTS | 2005 |
|
RU2292412C1 |
ROAD EMBANKMENT MADE ON PERMAFROST GROUND | 2005 |
|
RU2278213C1 |
CULVERT STRUCTURE FOR ROAD EMBANKMENT ERECTED ON PERMAFROST GROUND | 2006 |
|
RU2303675C1 |
METHOD FOR ERECTION OF BRIDGE SUPPORT PILLAR ON PERMAFROST | 2009 |
|
RU2455419C2 |
WATER CURRENT OVERPASS | 2006 |
|
RU2303676C1 |
DRAINAGE SYSTEM IN ROAD EXCAVATION OF TUNNEL TYPE ON PERMAFROST | 2021 |
|
RU2767636C1 |
EARTH STRUCTURE ON PERMAFROST WITH A TRANSVERSAL SLOPE OF THE TERRAIN | 2021 |
|
RU2769793C1 |
ROAD EMBANKMENT ON PERMAFROST | 2018 |
|
RU2705656C1 |
ROAD EMBANKMENT BUILT ON PERMAFROST GROUND | 2004 |
|
RU2256031C1 |
Authors
Dates
2006-04-27—Published
2004-10-06—Filed