FIELD: building, particularly to construct road embankments on permafrost ground.
SUBSTANCE: road embankment comprises embankment body composed of two stacked layers and ballast prism arranged on base platform. Each layer is formed as trapeze with larger base facing downwards. Lower base of upper layer trapeze has dimension c equal to that of upper base of lower layer trapeze. Lower base of upper layer trapeze mates upper base of lower layer trapeze. Upper layer has side slope less than that of lower layer. Main embankment parameters are determined from corresponding relations.
EFFECT: provision of embankment stability due to permafrost temperature reduction in embankment base.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
WATER CONSTRUCTION IN ROAD BANK ON PERMAFROSTS | 2005 |
|
RU2292412C1 |
SHALLOW TUNNEL FORMED IN PERMAFROST GROUND | 2004 |
|
RU2275471C1 |
SHALLOW TUNNEL FORMED IN PERMAFROST GROUND | 2004 |
|
RU2275472C1 |
CULVERT STRUCTURE FOR ROAD EMBANKMENT ERECTED ON PERMAFROST GROUND | 2006 |
|
RU2303675C1 |
PERMAFROST ROAD FILL | 2020 |
|
RU2744541C1 |
ROAD EMBANKMENT BUILT ON PERMAFROST GROUND | 2004 |
|
RU2256032C1 |
ROAD EMBANKMENT BUILT ON PERMAFROST GROUND | 2004 |
|
RU2256031C1 |
WATER CURRENT OVERPASS | 2006 |
|
RU2303676C1 |
ROAD EMBANKMENT ON PERMAFROST | 2018 |
|
RU2705656C1 |
GROOVE FOR ROAD BUILDING | 2003 |
|
RU2244781C1 |
Authors
Dates
2006-06-20—Published
2005-07-11—Filed