FIELD: mining industry.
SUBSTANCE: method includes operations of digging with full and gradually decreasing cutting width, transporting of soil, unloading it and returning scraper to face. Digging of soil is performed along one trail by gradually decreasing cutting width in one direction, then with full width of bucket - in opposite direction.
EFFECT: higher effectiveness and productiveness.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF EXCAVATION BY SCRAPERS IN TANDEM | 2006 |
|
RU2330144C2 |
METHOD AND DEVICE FOR WORKING BOTTOM HOLE WITH SCRAPER UNIT | 0 |
|
SU1758175A1 |
METHOD OF SOIL DIGGING BY SCRAPER AT CONSTANT DEPTH OF CUTTING | 2001 |
|
RU2203364C2 |
SCRAPER IN TANDEM | 2017 |
|
RU2655005C1 |
KNIFE SCRAPER SYSTEM | 2020 |
|
RU2757194C1 |
SCRAPER BLADE SYSTEM | 0 |
|
SU753997A1 |
SCRAPER BLADE SYSTEM | 2002 |
|
RU2215850C1 |
COMBINED SCRAPER BUCKET KNIFE SYSTEM | 2018 |
|
RU2679328C1 |
SCRAPER BUCKET | 2010 |
|
RU2467129C2 |
SCRAPER UNIT | 1991 |
|
RU2049863C1 |
Authors
Dates
2005-02-20—Published
2003-10-09—Filed