FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil and gas industry, namely to method of tightness testing of the cased injection well. Methods includes: determination of actual pressure difference on the packer ΔCp_a=Pwh1-Pfr-Cwh2+Cfr2-Perr1-Perr2, where Pwh1 and Pwh2 are measured wellhed pressure on injection to top and bottom reservoirs, respectively, Cfr1 and Pfr2 are pressure losses for friction during water movement via short and long strings. respectively, Perr1 and Perr2 are absolute errors of measurements by technical pressure gauge in short and long strings, respectively, atm. At that criterion of the tightness estimation is the pre-specified critical pressure difference ΔCd_cr. System tightness is estimated by comparison of the actual pressure difference on packer ΔCp_a and pre-specified critical pressure difference at |ΔCp_a|>|ΔCd_cr| the system is tight. Method of the tightness testing of the injection well contains stages at which: pressure change is registered in well blocked by the packer, by wellhead pressure measuring at input to tubing string in top and bottom reservoirs, respectively. Data analysis is performed, and tightness is determined. At that preliminary current water flowrate via pipeline is measured Q. Tightness is estimated if the following condition is met:
EFFECT: decreased number of tightness tests in wells operated under process of simultaneous-separate injection.
16 cl, 2 tbl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINING TUBING TIGHTNESS IN INJECTION WELLS | 2018 |
|
RU2693090C1 |
METHOD AND ARRANGEMENT FOR CONTROLLED INJECTION OF LIQUID THROUGH FORMATIONS | 2017 |
|
RU2636842C1 |
METHOD AND DEVICE FOR ADJUSTABLE INJECTION OF FLUID TO LAYERS WITH AUTOMATED MEASURING OF PROCESS PARAMETERS | 2015 |
|
RU2610484C9 |
METHOD OF OPERATION OF AN INJECTION WELL OF A SMALL DIAMETER WITH A SINGLE LIFT TWO-PACKER ARRANGEMENT | 2017 |
|
RU2678745C1 |
METHOD OF MONITORING SAFETY OF FUNCTIONING OF WELL FOR UNDERGROUND GAS STORAGE | 2017 |
|
RU2643871C1 |
METHOD FOR CONCURRENT-SEPARATE OPERATION OF SEVERAL BEDS VIA ONE FORCE WELL IN TURNS | 2003 |
|
RU2253009C1 |
METHOD FOR MONITORING TIGHTNESS OF INJECTION WELL (EMBODIMENTS) | 2017 |
|
RU2705683C2 |
INSTALLATION NAMED AFTER GARIPOV FOR OIL PRODUCTION WITH DUAL DISPOSAL OF BRINE WATER AND METHOD OF ITS IMPLEMENTATION (VERSIONS) | 2012 |
|
RU2534688C2 |
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
METHOD OF INJECTION WELL OPERATION WITH SINGLE-LIFT MULTI-PACKER ASSEMBLY | 2017 |
|
RU2655547C1 |
Authors
Dates
2015-05-20—Published
2013-06-10—Filed