FIELD: oil and gas production industry, particularly pressure-testing of cased well provided with flow string.
SUBSTANCE: method involves filling well with gravity solution; lowering inflatable packer connected to hollow logging cable in well along flow string; leading inflatable packer out of flow string and sealing cable lead in flow string at well head; injecting light-weight liquid in inflatable packer via hollow logging cable up to packer expansion and setting in casing pipe under flow string, wherein light-weight liquid has density of not less than that of well liquid; continuing light-weight liquid injection in packer via logging cable along with injecting gravity solution from well head into well hole annulus; maintaining cable interior and hole annulus pressure difference at threshold inner cable pressure level predefined by technical specifications; measuring pressure in hole annulus and recording pressure change; releasing pressure from logging cable and from hole annulus along with maintaining cable interior and hole annulus pressure difference at threshold inner cable pressure level predefined by technical specifications; lifting hollow logging cable and inflatable packer from well.
EFFECT: increased efficiency.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL OPERATION | 2007 |
|
RU2335624C1 |
METHOD AND ARRANGEMENT FOR CONTROLLED INJECTION OF LIQUID THROUGH FORMATIONS | 2017 |
|
RU2636842C1 |
METHOD OF OPERATION OF AN INJECTION WELL OF A SMALL DIAMETER WITH A SINGLE LIFT TWO-PACKER ARRANGEMENT | 2017 |
|
RU2678745C1 |
OPERATING METHOD OF WELL JET PUMP UNIT DURING HYDRAULIC FRACTURING OF FORMATIONS | 2019 |
|
RU2705708C1 |
METHOD FOR DETERMINING BEHIND-CASING FLOWS | 2013 |
|
RU2530806C1 |
METHOD FOR MONITORING TIGHTNESS OF INJECTION WELL (EMBODIMENTS) | 2017 |
|
RU2705683C2 |
METHOD OF HYDRODYNAMIC ACTION ON BOTTOM-HOLE FORMATION ZONE | 2011 |
|
RU2483200C1 |
METHOD OF SIMULTANEOUS-SEPARATE LIQUID INJECTION AS PER RESERVOIRS WITH POSSIBILITY TO MEASURE PARAMETERS OF INJECTED LIQUID AND INSTALLATION FOR ITS IMPLEMENTATION | 2014 |
|
RU2552405C1 |
METHOD FOR PRESSURE TEST OF TUBING STRING | 2011 |
|
RU2455479C1 |
METHOD FOR DETERMINING TUBING TIGHTNESS IN INJECTION WELLS | 2018 |
|
RU2693090C1 |
Authors
Dates
2007-11-10—Published
2006-12-06—Filed