FIELD: mining industry.
SUBSTANCE: method includes erection of rows of main platforms along bed length in staggered order with length equal or divisible by step value for support displacement, and placing filling material thereon. Along length of main platforms between ceiling and bed soil post support is mounted, upon which filling material is fed. After that between main platforms additional platforms are erected with wedge supporting, and main platforms are rotated counter-clockwise towards pneumatic support and it is displaced for one drive step. During that filling material, while lowering, unwedges wedge support between ceiling and bed soil and forms artificial supports. After that additional platforms are rotated counter-clockwise towards pneumatic support. After movement of cleaning face for two drive steps operations for constructing artificial supports are repeated. Distance between main platforms along bed fall line are selected from mathematical expression.
EFFECT: higher efficiency.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
ARTIFICIAL SUPPORT AND METHOD OF ITS CONSTRUCTION IN MINING OF STEEP BEDS | 1998 |
|
RU2147687C1 |
ARTIFICIAL SUPPORT FOR USE WHEN EXTRACTING STEEP BEDS | 2004 |
|
RU2253019C1 |
METHOD TO SAFEGUARD DEVELOPMENT OPENINGS | 2010 |
|
RU2441164C1 |
METHOD FOR DEVELOPMENT OF STEEP COAL SEAMS WITH BACKING WORKED-OUT AREA | 1995 |
|
RU2083833C1 |
METHOD OF CROSSOVER WITH WORKING FACE OF DEVELOPMENT PASSED WITH FORMATION ROOF SLASHING | 2011 |
|
RU2472934C1 |
MECHANIZED PNEUMATIC SUPPORT | 2004 |
|
RU2260125C1 |
METHOD FOR MINING THICK STEEPLY INCLINED AND STEEP COAL BEDS | 2009 |
|
RU2398966C1 |
METHOD OF MINING COAL SEAMS | 0 |
|
SU1728488A1 |
METHOD OF PREVENTION OF DEVELOPMENT ENTRIES IN COAL BED AREAS | 2007 |
|
RU2341657C1 |
POWERED PNEUMATIC SUPPORT | 1990 |
|
RU2030588C1 |
Authors
Dates
2005-02-20—Published
2003-12-10—Filed