FIELD: mining industry.
SUBSTANCE: method includes cutting well field portions by driving bed and field mines. At mine fields to be prepared with weak rock stability driving of several field preparatory mines is performed at portion of field with width determined from formula. Bed preparation mines on same portion are driven alter, with displacement of cleaning operations from these may be driven in portions, at which their stability is provided for technological time period with inter-drift blocks of given rigidity.
EFFECT: higher safety.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF EXCAVATING MINERAL BEDS | 0 |
|
SU1361328A1 |
METHOD FOR PREPARATION OF BEDDED DEPOSITS TO REVERSE ORDER OF MINING WHEN IMMEDIATE ROOF ROCK IS UNSTABLE | 2009 |
|
RU2398965C1 |
METHOD OF MINING BED MINERAL DEPOSITS | 0 |
|
SU1752957A1 |
METHOD OF PREPARATION OF BEDDED DEPOSITS FOR ROOM MINING SYSTEM WITH RETREATING | 2001 |
|
RU2211332C1 |
PREPARATION METHOD OF BED DEPOSITS FOR ADVANCE MINING AT ROOM-AND-PILLAR SYSTEM | 2010 |
|
RU2435961C1 |
METHOD OF PREPARATION AND MINING CONTIGUOUS FLAT SEAMS | 2013 |
|
RU2530102C1 |
METHOD FOR MINING GENTLY DIPPING MINERAL BEDS | 0 |
|
SU1789020A3 |
METHOD FOR PREPARATION OF EXCAVATION SITE AT CHAMBER DEVELOPMENT SYSTEM | 2015 |
|
RU2577570C1 |
METHOD FOR MINING GENTLY DIPPING COAL SEAMS | 1991 |
|
RU2021509C1 |
METHOD OF FULL DEVELOPMENT OF GENTLY SLOPING COAL BEDS WITH POWER-DRIVEN SYSTEMS WITHOUT ANY PREPARATORY MINE WORKINGS | 2010 |
|
RU2444624C1 |
Authors
Dates
2005-02-27—Published
2003-07-22—Filed