FIELD: mining.
SUBSTANCE: air supplying gate and the main air gate pass along opposite boundaries of mine field so that they run ahead of extraction front through the length equal to distance between axes of the rooms. At that, rooms have the length equal to width of mine field and are located between air supplying gate and ventilation air gate. Fresh air is supplied through the tunnel located in front of extraction front. At that, return ventilation air is removed along auxiliary air gate.
EFFECT: improving concentration of mining operations, reducing volumes of preparatory mine work, and decreasing air leaks through the worked-out area.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF STRATIFIED DEPOSITS USING CHAMBER SYSTEM | 2011 |
|
RU2479720C1 |
METHOD FOR CHAMBER MINING WHEN PREPARING HORIZONS | 2016 |
|
RU2627803C1 |
METHOD OF WORKING THIN GENTLY-SLOPING GAS-LADEN DUST-HAZARDOUS COAL BED | 0 |
|
SU1016514A1 |
METHOD OF BLOCK PREPARATION AND PRIFILING OF THE CONTIGUOUS FLAT SYLVINITE LAYERS BY CHAMBERS | 2014 |
|
RU2552270C1 |
METHOD OF PREPARATION AND MINING CONTIGUOUS FLAT SEAMS | 2013 |
|
RU2530102C1 |
COMPLEX GAS EMISSION CONTROL METHOD USED WHEN PREPARING AND EXTRACTING HIGH GAS-BEARING COAL BEDS | 2005 |
|
RU2366816C2 |
METHOD FOR PREPARATION OF GENTLY DIPPING COAL SEAMS FOR MINING | 1991 |
|
RU2021510C1 |
METHOD OF PREPARATION AND DEVELOPMENT OF EXTRACTION UNIT BY DIAGONAL CHAMBERS | 2019 |
|
RU2709266C1 |
METHOD FOR REMOVAL FIELD PREPARATION IN CASE OF CHAMBER-COLUMNAR EXCAVATION SYSTEM | 2003 |
|
RU2229599C1 |
METHOD FOR OPENING AND PREPARATION OF MINE FIELD FOR FLAT-LAYING COAL SEAM | 2005 |
|
RU2278262C1 |
Authors
Dates
2011-12-10—Published
2010-05-24—Filed