FIELD: mining industry.
SUBSTANCE: method includes preparation of slanting extraction fields at whole area, driving transport drifts, driving ventilation drift for upper extraction field and use of transport drifts of extracted fields as ventilation drifts during extraction of lower extraction fields, and preparation of chamber for coal through block lower than transport drift. Transport drift and chamber are driven with straight preparation and extraction order for extraction fields, using solid system of fields extraction. Chamber is connected to transport drift by links and is driven in advance relatively to it with slant to provide for free draining of water from transport drift and chamber. Chamber width is set on basis of condition for displacement of working toll of technological extraction complex in it.
EFFECT: higher intensiveness, higher reliability.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTION OF SLANTED EXTRACTION FIELDS ON GENTLY SLOPING COAL BEDS | 2003 |
|
RU2248447C1 |
METHOD OF MINING OF INCLINED MINING FIELDS ON MEDIUM-THICK FLAT-DIPPING COAL SEAMS | 2001 |
|
RU2206742C2 |
METHOD OF MINING OF INCLINED MINING FIELDS ON THIN AND MEDIUM-THICK FLAT-DIPPING COAL SEAMS | 2001 |
|
RU2206743C2 |
DEVELOPMENT METHOD OF MINE SECTIONS DURING PANEL WORKING | 2009 |
|
RU2413842C1 |
METHOD FOR PREPARING COAL PLAST FOR PROCESSING | 2017 |
|
RU2655502C1 |
OPEN-UNDERGROUND MINING OF COAL SEAMS | 2013 |
|
RU2524709C2 |
METHOD OF MINE WORKING | 2005 |
|
RU2338881C2 |
METHOD OF MINING OF MINE SECTIONS | 2009 |
|
RU2407890C1 |
METHOD FOR LOW-THICKNESS AND MEDIUM-THICKNESS SEAM DEVELOPMENT ALONG STRIKE WITH ROCK LEAVING IN MINE | 2005 |
|
RU2305187C2 |
METHOD FOR EXTRACTING LOW AND AVERAGE THICKNESS BEDS ACROSS THE RUN WITH ROCK LEFT IN MINE | 2005 |
|
RU2301333C2 |
Authors
Dates
2005-02-27—Published
2003-07-08—Filed