FIELD: building.
SUBSTANCE: method involves constructing multilayer foundation; erecting upper building structures. Process of foundation forming includes laying concrete layer on base; preparing water-proof layer above concrete layer; forming one or more cast-in-place and/or composite and/or precast reinforced concrete panels along foundation height or area; forming intermediate layer of hardening material under upper panel and/or panels before and/after their forming, wherein hardening material characteristics are determined from a given relation; forming channels with opened ends in upper panel so channels extend the full panel thickness and preferably have widened areas in lower parts thereof; installing tubes preferably having widened areas in lower parts thereof; sealing intermediate layer and/or water-proof foundation layer along foundation perimeter; channels are formed in places of highest design foundation settlement and deflection, including areas under load-bearing support structure building members, namely columns and/or walls. Upper channel and/or tube ends are located in access area. Channels and tubes are used for injecting hardening material in intermediate layer through upper channel and tube ends during erecting and/or using building, during performing building, including earth-moving, works near building or building structures, which may result in building settlement and/or heeling and/or deformation. Injection of hardening material forms separation into layers and/or cracks in intermediate layer, which are filled with hardening material. Hardening material is injected in channel or pipe having x, y coordinates with pressure, also determined from a given relation.
EFFECT: reduced building settlement, heeling and deformation during erection and usage.
14 cl
Title | Year | Author | Number |
---|---|---|---|
BUILDING AND CONSTRUCTION ERECTING METHOD, AND DEVICE FOR METHOD'S IMPLEMENTATION | 2007 |
|
RU2369692C2 |
METHOD FOR BUILDING, STRUCTURE ERECTION | 2007 |
|
RU2336391C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD FOR DETERMINING NUMBER OF WORKINGS WHILE CONDUCTING ENGINEERING AND GEOLOGICAL SURVEYS | 2016 |
|
RU2631445C2 |
METHOD OF ERECTING HIGH-RISE BUILDING ON NATURAL BASE | 2016 |
|
RU2634762C1 |
METHOD TO RECOVER CONTACT LAYER "FOUNDATION - SOIL BASE" | 2015 |
|
RU2572477C1 |
METHOD FOR REINFORCING BASEMENT SOIL | 2006 |
|
RU2333318C1 |
BUILDING STRAIGHTENING METHOD | 2004 |
|
RU2275474C2 |
METHOD TO CONSTRUCT BUILDINGS, STRUCTURES ON UNEVENLY COMPRESSIBLE SOILS | 2011 |
|
RU2494194C2 |
METHOD FOR CORRECTION OF VERTICAL POSITION OF BUILDINGS AND STRUCTURES ON PANEL-WALL FOUNDATION | 2007 |
|
RU2352723C1 |
Authors
Dates
2005-03-10—Published
2004-01-27—Filed