FIELD: construction.
SUBSTANCE: method of erecting a high-rise building on a natural base includes calculating the stress-strain state of the "base-foundation-structure", arranging a slab foundation and erecting a high-rise building with redistributing the stiffening elements in accordance with the condition of uniformity of the foundation settings. First, the slab foundation for the high-rise part of the building is arranged, and the building is erected at a calculated height calculated based on the condition of preventing the building from tipping over under the seismic and/or wind impact. Then the slab foundation for the stylobate part of the building is arranged, and the remaining part of the high-rise building and that of the stytlobate are erected simultaneously, while ensuring the uniform foundation setting.
EFFECT: reducing the unevenness of the base deformations and reducing the efforts in the structures of the building due to the temporary separation of the settings of the high-rise part and the stylobate part, the possibility of erecting a high-rise building in areas with the seismicity of up to 9 points on a natural base.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ERECT PILED RAFTS IN SEISMIC AREAS | 2012 |
|
RU2513050C1 |
METHOD OF REGULATION OF DIFFERENTIAL SETTLEMENTS OF MULTI-STORIED BUILDING WITH RAFT OR PILED-RAFT FOUNDATION | 2012 |
|
RU2520751C1 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2008 |
|
RU2378454C1 |
METHOD FOR ERECTION OF COMPREHENSIVE DEVELOPMENT BUILDING | 2008 |
|
RU2391464C2 |
CONSTRUCTION METHOD OF PILE-SLAB FOUNDATION OF HIGH-RISE BUILDING | 2013 |
|
RU2549632C1 |
METHOD FOR CONSTRUCTION AND ANALYSIS OF STRESSED DEFORMED CONDITION OF BUILDINGS, STRUCTURES AND OTHER VERTICALLY EXTENDED OBJECTS ON UNEVENLY COMPRESSED SOILS | 2011 |
|
RU2476642C2 |
COMBINED (PILE-SLAB, PILE-BELT, PILE-COLUMNAR) FOUNDATION ERECTION METHOD | 2015 |
|
RU2667163C2 |
METHOD FOR BUILDING PROTECTION AGAINST NON-UNIFORM SETTLEMENT | 2005 |
|
RU2287638C1 |
METHOD FOR REDUCING DIFFERENCE IN SETTLEMENT DURING BUILDING CONSTRUCTION | 2004 |
|
RU2265107C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
Authors
Dates
2017-11-03—Published
2016-07-20—Filed