FIELD: mining and other industries.
SUBSTANCE: proposed hopper is designed for accumulating loose lump materials. Mobile hopper has vertical housing and discharge funnel. Hopper is furnished with winch secured on funnel, guide support shoes, support wheel and pushers with catchers installed on vertical housing. Discharge ports to pass rock are made in discharge funnel. Vertical housing is installed for rotation around axis of discharge funnel in guides on rollers whose axle are rigidly secured on vertical housing. Height B of pusher catcher mounting relative to ground is taken equal to discharge height of loader bucket. Distance M between outer edges of catchers is taken not to exceed (0.8-0.9)H, and diameter L of vertical housing is taken to be within (1.1-1.5)H, where H is width of bucket, m.
EFFECT: provision of operative loading of rock onto scraper conveyor, increased capacity of loaders owing to exclusion of movement of loaded vehicle, improved safety.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
AGGREGATED MINING COMPLEX | 2020 |
|
RU2734177C1 |
SHAFT-SINKING SET | 1992 |
|
RU2026982C1 |
EXCAVATION AND LOADING DRAGLINE | 2022 |
|
RU2802772C1 |
MACHINERY SET FOR DRIVING MINING WORKINGS | 0 |
|
SU870724A1 |
LOADING DRAGLINE EXCAVATOR | 1993 |
|
RU2039160C1 |
MINING SYSTEM WITH CONTINUOUS EXTRACTION | 2011 |
|
RU2577867C2 |
PROFESSOR KARIMAN METHOD FOR UNDERGROUND EXTRACTION OF MINERALS BY LARGE BLOCKS | 2011 |
|
RU2459078C1 |
METHOD BY PROFESSOR KARIMAN FOR RECOVERY OF METHANE FROM DEVELOPED COAL BEDS BY PRODUCTION OF COAL IN LARGE BLOCKS AND THEIR GRINDING IN GRINDING CHAMBER | 2010 |
|
RU2455491C1 |
METHOD OF MINE CONSTRUCTION FOR SMALL KIMBERLITE PIPES BY MEANS OF SELF-PROPELLED MINING MACHINERY AND COMPLEX FOR ITS LOWERING AND LIFTING AND ORE DELIVERY TO SURFACE | 1998 |
|
RU2158826C2 |
OVERLOADER | 2000 |
|
RU2172840C1 |
Authors
Dates
2005-05-10—Published
2003-07-22—Filed