FIELD: mining.
SUBSTANCE: mining system comprises the drift and emptying funnel drift crossing the excavation to allow the access to said funnel. Note here that said system comprises the conveyor extending along the drift and the track extending along the drift. Material collector displaces on rails along the drift to place the material on the conveyor. Loading machine displaces from the drift to emptying funnel for material removal therefrom and displacement of said material to said material collector. Compaction material includes the fixed part secured relative to the emptying funnel drift. Moving part is coupled with the loading machine and with fixed part for displacement of loading machine to emptying funnel and to removing material.
EFFECT: continuous extraction of the material.
24 cl, 12 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING OPERATIONS AT UNDERGROUND ENTERPRISES BY MEANS OF MINING WITH CAVING | 2006 |
|
RU2376477C1 |
METHOD OF PREPARING BLOCK BOTTOM | 0 |
|
SU1157238A1 |
METHOD FOR MINING INCLINED ORE BODIES | 1994 |
|
RU2081319C1 |
METHOD OF EXTRACTING MINERAL DEPOSIT | 0 |
|
SU1763656A1 |
METHOD OF UNDERGROUND MINING OF ORE DEPOSITS | 1999 |
|
RU2167296C1 |
METHOD OF MINED-OUT SPACE FILLING | 2015 |
|
RU2603992C1 |
PROCESS DIAGRAM OF EXTRACTION SECTION OF UNDERGROUND SAFE DEVELOPMENT OF HIGH-GAS-BEARING FORMATION | 2018 |
|
RU2735072C2 |
DEVICE FOR EXCAVATING PRODUCT IN UNDERGROUND BREAKAGE FACES | 2004 |
|
RU2334111C2 |
MINING METHOD FOR STEEP ORE BODIES | 2007 |
|
RU2325529C1 |
METHOD OF PREPARING BLOCK BOTTOM | 0 |
|
SU752005A1 |
Authors
Dates
2016-03-20—Published
2011-07-08—Filed