FIELD: hydraulic engineering, particularly for forming temporary structures for enclosing closed in plane water area bottom part and space above the bottom part through the full water thickness.
SUBSTANCE: method of shallow tunnel construction involves forming structure enclosing closed in plane bottom part; removing water from the structure; performing works in dry structure and demounting above structure. Method of enclosing structure forming involves producing bottomless hydraulic enclosure with controlled floatability; transporting and moving thereof to tunnel path; immersing the enclosure in water up to reaching water area bottom by reducing floatability thereof and fixing enclosure with fastening means and anchor system; leveling upper enclosure part with horizon line and arranging cranage and platforms for building material storage on upper enclosure part; erecting cutoff walls inside space defined by enclosure; removing water from the enclosure; developing bottom ground by trench digging; constructing pile tunnel base; building foundation grill on pile tunnel base; locating composite or precast reinforced concrete tunnel sections on foundation grill; recovering initial floatability of the enclosure. Enclosure structure has movable fastening means formed as blades along vertical walls thereof.
EFFECT: increased tunnel reliability, reduced time of erection thereof.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ARRANGEMENT OF SHALLOW SUBWAY AT WATER AREA BOTTOM | 2008 |
|
RU2386755C1 |
METHOD FOR FORMATION OF CLOSED SECTION OF WATER AREA BOTTOM WITH POSSIBILITY OF ITS DRYING AND SYSTEM, WHICH REALISES IT | 2008 |
|
RU2382142C2 |
METHOD TO CONSTRUCT AND REPAIR WATER CONDUITS AND HEADERS OF SHALLOW WASTE WATER ON BOTTOM OF RIVERS AND WATER RESERVOIRS | 2011 |
|
RU2465408C1 |
METHOD OF CONSTRUCTION OF UNDERWATER TUNNELS | 2017 |
|
RU2662837C1 |
METHOD FOR STRUCTURE CONSTRUCTION IN THE UNDER-RUNNER SPACE OF RIVERS AND CANALS IN URBAN DEVELOPMENT | 2021 |
|
RU2770187C1 |
METHOD FOR CONSTRUCTION OF TRANSPORT TUNNEL OF TRANSITION | 2015 |
|
RU2586345C2 |
METHOD TO MANUFACTURE FLOAT-ON ELEMENTS OF HYDRAULIC ENGINEERING STRUCTURE | 2012 |
|
RU2494191C1 |
METHOD TO INSTALL PLATFORM SUPPORT BLOCK | 2010 |
|
RU2446250C2 |
METHOD FOR CONSTRUCTION OF A NAVAL BASE ON AN OPEN WATER | 2022 |
|
RU2797792C1 |
METHOD FOR CONSTRUCTION OF GEOTECHNICAL STRUCTURES IN THE WATER AREA OF URBAN RIVERS AND CANALS | 2022 |
|
RU2791119C1 |
Authors
Dates
2005-05-20—Published
2004-07-16—Filed