FIELD: thermal engineering; thermal power stations.
SUBSTANCE: proposed thermal power station that has steam turbine with full-flow condensate pipeline communicating with high-pressure deaerator and makeup water vacuum deaerator with source water and heating agent pipelines is characterized in that source makeup water pipeline is joined with condensate pipeline of low-pressure regenerative heater first along full-flow condensate line via connecting piping and that power station is provided with regulator controlling dissolved oxygen content in mixed flow of full-flow condensate and makeup water; this regulator is joined to full-flow condensate pipeline beyond vacuum system of turbine unit for instance, downstream of low-pressure heater second along full-flow condensate line; it is also connected to control element installed on connecting piping.
EFFECT: enhanced economic efficiency and operating reliability of thermal power station.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF THERMAL POWER STATION | 2003 |
|
RU2249703C1 |
THERMAL POWER STATION | 2003 |
|
RU2249704C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2003 |
|
RU2246624C1 |
THERMAL POWER STATION | 2003 |
|
RU2249705C1 |
THERMAL POWER STATION OPERATING PROCESS | 2003 |
|
RU2244132C1 |
THERMAL POWER PLANT | 2000 |
|
RU2175390C1 |
THERMAL POWER PLANT | 2011 |
|
RU2461722C1 |
THERMAL POWER PLANT | 2000 |
|
RU2175389C1 |
THERMAL POWER PLANT | 2000 |
|
RU2170829C1 |
METHOD OF OPERATING THERMAL POWER STATION | 2000 |
|
RU2174182C1 |
Authors
Dates
2005-05-20—Published
2003-11-11—Filed