FIELD: heat power engineering; thermal power stations. SUBSTANCE: according to claimed method, full-flow condensate of turbine is heated successively in low-pressure regenerative heaters, make-up feed water is deaerated in vacuum deaerator into which heating agent is delivered, then deaerated make-up feed water is mixed with full-flow condensate of turbine before one of regenerative heaters. Regenerative bleed-off steam is used as a heating agent. Said steam is fed into regenerative heater before which deaerated make-up feed water is mixed with full-flow condensate of turbine. EFFECT: improved economy and reliability. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
THERMAL POWER PLANT OPERATION PROCESS | 2000 |
|
RU2170828C1 |
THERMAL POWER STATION OPERATING PROCESS | 2000 |
|
RU2166642C1 |
METHOD OF OPERATING THERMAL POWER STATION | 2000 |
|
RU2174181C1 |
THERMAL POWER PLANT | 2000 |
|
RU2175390C1 |
THERMAL POWER PLANT | 2000 |
|
RU2175389C1 |
THERMAL POWER PLANT | 2000 |
|
RU2170829C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214522C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214518C2 |
METHOD FOR OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214521C2 |
THERMAL POWER STATION | 2000 |
|
RU2174183C1 |
Authors
Dates
2001-09-27—Published
2000-06-09—Filed