METHOD FOR SHEET-PILE ENCLOSURE OR RETAINING WALL FORMING WITH GROUND WATER FLOW CONTROL Russian patent published in 2006 - IPC E02D5/20 E02D5/56 

Abstract RU 2283921 C2

FIELD: building, particularly pile foundations or sheet-pile enclosures or retaining walls to be erected in sites with free ground water flow.

SUBSTANCE: method involves lowering spaced piles in ground up to design mark to create sheet-pile enclosure or retaining wall. To provide control of free ground water horizon flow through the sheet-pile enclosure or retaining wall above sheet piles made as solids of revolution and provided with tips in lower pile parts and screw auger on outer pile surfaces are driven transversely to ground water flow direction to open ground water flow between adjacent piles. Additional piles are driven in ground between main piles. Additional piles have screw augers to drill areas between main piles. Excavated ground is substituted for filtering member by reverse auger rotation. The filtering member is formed of non-soluble granular material, which does not erode under the action of water. Granular mix of the filtering member is selected to prevent suffusion, contact uplift and mudding of filtering pile body.

EFFECT: possibility to maintain natural ground water flow regime during enclosure of retaining wall erection, to retain hydrological regime and ground characteristics in ground areas adjoining the enclosure.

2 dwg

Similar patents RU2283921C2

Title Year Author Number
METHOD OF CONSTRUCTION OF SHEET PILING WHEN CONDUCTING WORKS AT MAJOR PIPELINE AND MOUNTABLE-DISMOUNTABLE SHEET PILING FOR DEVELOPMENT OF FOUNDATION PIT 2012
  • Kazakov Sergej Nikolaevich
RU2530142C2
METHOD FOR CONCRETE PILE SHOE FORMING 2004
  • Basiev Akhsar Nikolaevich
RU2276227C1
BORED PILE AND METHOD FOR PILE ERECTION IN KARST OR SOFT GROUND 2004
  • Basiev Akhsar Nikolaevich
RU2270294C1
METHOD OF ERECTING TONGUE-AND-GROOVE ENCLOSURE DURING MAIN PIPELINE OPERATIONS AND SHEET COLLAPSIBLE ENCLOSURE FOR CONSTRUCTION OF PIT 2018
  • Yadrikhinskij Dmitrij Borisovich
RU2705674C2
PROCESS OF ERECTION OF GUARDING ANTIFILTRATION ENGINEERINGPRTECTIVE STRUCTURE 2001
  • Basiev A.N.
  • Zelov M.V.
  • Ikusov A.G.
RU2206663C1
TECHNIQUE TO ERECT ANTIFILTRATION ENGINEERING-PROTECTIVE STRUCTURE 2001
  • Basiev A.N.
  • Zelov M.V.
  • Ikusov A.G.
RU2211283C1
PROCESS OF DEEP COMPACTION OF SOIL 1997
  • Basiev A.N.
  • Mariupol'Skij L.G.
RU2141020C1
PROCESS OF ERECTION OF PILE IN GROUND 2001
  • Basiev A.N.
  • Zelov M.V.
  • Ikusov A.G.
RU2208088C2
PROCESS OF ERECTION OF PILE IN GROUND 2001
  • Basiev A.N.
  • Zelov M.V.
  • Ikusov A.G.
RU2208089C2
PILE 2001
  • Basiev A.N.
  • Zelov M.V.
  • Ikusov A.G.
RU2204653C2

RU 2 283 921 C2

Authors

Basiev Akhsar Nikolaevich

Dates

2006-09-20Published

2004-09-08Filed