FIELD: civil engineering, pile foundations. SUBSTANCE: pile presents body of revolution extended in length with tip in lower part on which outer surface screw is mounted. Novelty of proposal consists in manufacture of screw from metal rolled product of constant section with preset pitch and angle of coiling. Coiling of screw is continuous or sectional along length of pile comprising individual interjoined helical links, attachment members are anchored on outer surface over length of body of revolution. Attachment members are intended for rigged anchoring of helical links of screw. EFFECT: increased density of compacted ground in zone of wall of ground hole accommodating pile over length of pile, provision for change of coiling parameters at place of formation of foundation. 4 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
TECHNIQUE TO ERECT ANTIFILTRATION ENGINEERING-PROTECTIVE STRUCTURE | 2001 |
|
RU2211283C1 |
PROCESS OF ERECTION OF GUARDING ANTIFILTRATION ENGINEERINGPRTECTIVE STRUCTURE | 2001 |
|
RU2206663C1 |
PROCESS OF ERECTION OF PILE IN GROUND | 2001 |
|
RU2208088C2 |
PROCESS OF ERECTION OF PILE IN GROUND | 2001 |
|
RU2208089C2 |
BORED PILE AND METHOD FOR PILE ERECTION IN KARST OR SOFT GROUND | 2004 |
|
RU2270294C1 |
METHOD FOR CONCRETE PILE SHOE FORMING | 2004 |
|
RU2276227C1 |
RETAINING TRENCH STRUCTURE | 2005 |
|
RU2304663C2 |
METHOD FOR SHEET-PILE ENCLOSURE OR RETAINING WALL FORMING WITH GROUND WATER FLOW CONTROL | 2004 |
|
RU2283921C2 |
METHOD AND ANCHOR SYSTEM FOR SECURING PIT BORDERING | 2003 |
|
RU2254417C1 |
METHOD FOR CONSTRUCTING BORED PILE IN SOIL | 2023 |
|
RU2804651C1 |
Authors
Dates
2003-05-20—Published
2001-08-28—Filed