FIELD: mining.
SUBSTANCE: deposit is worked in three stages. At the first stage deposit is divided into mining units by vertical water-conservation concrete blocks with horizontal sump opening in lower part. At the second stage - along upper border of bed or in one of overlying beds, water preservation horizontal concrete block of alternating thickness is formed from hardening backfilling. At the third stage - stocks of mining unit are subsequently developed using available chamber-pillar technology. To reduce losses of balancing stocks, interchamber pillars are arranged as three-layer in the form of central filling mass and vertical protective layers from potassium salt along its both sides.
EFFECT: invention makes it possible to develop an active system of underground mine protection in production of potassium salts against possible flooding with subsurface waters.
3 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
UNDERGROUND HARD ROCK MINERALS FIELDS DEVELOPMENT METHOD | 2008 |
|
RU2379513C1 |
METHOD OF DEVELOPING THICK ORE DEPOSITS BY UNDERGROUND MINING WITH INTERCHAMBER PILLARS SUPPORT | 2009 |
|
RU2405109C1 |
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2585318C1 |
METHOD OF MINING MINERAL DEPOSITS | 0 |
|
SU1263855A1 |
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2584485C1 |
METHOD OF PREVENTION OF FLOODING OF POTASSIUM MINES AND HAZARDOUS DEFORMATIONS OF EARTH SURFACE AT UNDERGROUND WATER INRUSH INTO MINES | 2007 |
|
RU2341658C1 |
METHOD FOR DEVELOPING KIMBERLITE DEPOSITS | 2017 |
|
RU2664281C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD FOR EXTRACTING DEPOSITS OF WATER-SOLUBLE MINERAL RESOURCES | 2004 |
|
RU2254471C1 |
UNDERGROUND MINERAL MINING METHOD | 2005 |
|
RU2306417C2 |
Authors
Dates
2010-11-10—Published
2009-02-27—Filed