FIELD: construction of industrial and civil buildings on soft and sedimentary ground, excavation of profiled trenches and foundation pits.
SUBSTANCE: method involves perforating and expanding ground with operational disc-like tool mounted on axis by stepwise increasing cross-section of initial cavity formed by operational tool including n discs. Number of discs and shape thereof depend on mechanical ground quality and predetermined trench profiles. The stepwise cavity expanding is performed by increase in disc number and by disc diameters decrease starting with one having the greatest diameter. Trench walls are strengthened during or after ground puncturing or expanding by introducing reinforcing material and/or plasticizer. Operational tool has low-adhesion coating.
EFFECT: reduced labor inputs, decreased cost.
3 cl, 1 ex, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
WORKING TOOL AND METHOD FOR PROFILED PIT FORMING | 2004 |
|
RU2277152C2 |
FOUNDATION ERECTION METHOD | 2004 |
|
RU2269624C1 |
METHOD FOR STRENGTHENING LOW-STRENGTH WATER-SATURATED SOILS OF BASE OF TAPE FOUNDATION AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2747744C2 |
FOUNDATION ERECTION METHOD | 2004 |
|
RU2268961C1 |
PILE-SLAB FOUNDATION AND METHOD OF ITS CONSTRUCTION | 2000 |
|
RU2163281C1 |
METHOD OF MAKING FOUNDATION PIT | 0 |
|
SU1559049A1 |
METHOD OF MAKING PITS IN SANDY SOILS | 0 |
|
SU829785A1 |
METHOD OF ERECTION OF BUILDING FOUNDATION | 0 |
|
SU1742423A1 |
METHOD OF ERECTING BUILDING FOUNDATION IN HEAVING SOIL | 0 |
|
SU1599481A1 |
METHOD OF MAKING EXCAVATIONS IN CLAYEY SOIL | 0 |
|
SU702114A1 |
Authors
Dates
2005-06-27—Published
2004-04-19—Filed