FIELD: oil industry.
SUBSTANCE: method includes determining dominating frequency of productive bed by performing prior vibration-seismic action using surface oscillations source at different frequencies and analysis of seismic graphs from seismic receivers in product wells. Vibration-seismic effect on watered portion of productive bed of oil deposit is performed by a group of surface oscillations sources, operating at dominating frequency of productive bed. Bed fluid is extracted via product wells. After vibration-seismic effect on watered portion of productive bed of oil deposit by a group of surface oscillations sources, operating at domination frequency of productive bed, concurrent vibration-seismic effect is performed using two sub-groups of said group of surface oscillation sources. Each sub-group of group operates at determined from mathematical dependence. Average frequency of surface oscillations sources of whole group is equal to dominating frequency of productive bed. Difference in frequencies, on which each sub-group operates, is determined in accordance to linear size of watered portion of productive bed of oil deposit and is satisfactory to mathematical dependence. Concurrent vibration-seismic effect by two sub-groups of said group of surface oscillations sources is performed with forming of wave having length exceeding length of wave with dominating frequency.
EFFECT: higher oil yield.
2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SEISMICALLY INFLUENCING PRODUCTIVE FORMATION | 2005 |
|
RU2291956C2 |
METHOD OF OIL PRODUCTION INTENSIFICATION | 2014 |
|
RU2553122C1 |
METHOD OF DEVELOPMENT OF DROWNED OIL DEPOSIT AND DEVICE FOR VIBROSEISMIC TREATMENT OF THIS DEPOSIT | 1999 |
|
RU2172819C1 |
METHOD OF HYDROCARBON POOL DEVELOPMENT | 2002 |
|
RU2191891C1 |
METHOD OF HYDROCARBON POOL DEVELOPMENT | 2002 |
|
RU2191890C1 |
PROCESS OF EXPLOITATION OF FLOODED OIL FIELD AND GEAR FOR ITS IMPLEMENTATION | 1999 |
|
RU2163660C1 |
HYDROCARBON RESERVOIR DEVELOPMENT METHOD | 2004 |
|
RU2261985C1 |
METHOD OF HYDROCARBON DEPOSIT DEVELOPMENT WITH PHYSICAL EFFECT ONTO GEOLOGICAL MEDIUM | 2007 |
|
RU2349741C2 |
PROCESS OF EXPLOITATION OF FLOODED OIL DEPOSITS | 1992 |
|
RU2057906C1 |
METHOD OF DEVELOPING FLOODED OILFIELD | 0 |
|
SU1596081A1 |
Authors
Dates
2005-06-27—Published
2004-08-02—Filed