FIELD: building units, particularly bulk storage containers.
SUBSTANCE: method involves lifting reservoir at design level, cutting reservoir bottom along perimeter thereof so that cutting line is spaced a distance equal to reservoir rim width from reservoir walls; marking reservoir for following forming windows, wherein marks are located at a distance equal to integer number of widths of rolled sheet used for reservoir rim forming; lifting reservoir wall up to reaching the design level; installing composite fixed supports under reservoir wall in gap between window marks near lifting jacks; cutting out the marked windows and performing repair of reservoir bottom rims; reconstructing foundation; removing reservoir from supports; removing lifting jacks; performing further reservoir repair between previously repaired areas; repeating all repairing operations for another reservoir areas up to repair completion.
EFFECT: increased quality, reliability and absence of clearance gaps on reservoir bottom and wall.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REPAIRING BASIS OF STEEL RESERVOIRS AND VIBRATING SCREED FOR ITS IMPLEMENTATION | 2016 |
|
RU2626504C1 |
METHOD FOR REPAIR OF BASE OF VERTICAL METAL TANKS FOR OIL PRODUCTS AND OIL | 2021 |
|
RU2756591C1 |
METHOD FOR LIFTING AND RETENTION OF VERTICAL STEEL RESERVOIR | 2015 |
|
RU2584713C1 |
RESERVOIR CONSTRUCTION METHOD | 2004 |
|
RU2264504C1 |
DEVICE FOR REPAIR OF VERTICAL WALL OF STEEL SCROLL TANK | 2013 |
|
RU2553804C1 |
LIQUEFIED NATURAL GAS STORAGE TANK | 2024 |
|
RU2824699C1 |
METHOD OF ERECTING TWO-STAGE ISOTHERMAL RESERVOIR | 0 |
|
SU670711A1 |
METHOD OF MOUNTING TWO-STEP ISOTHERMIC TANK | 0 |
|
SU1597437A2 |
DEVICE FOR REPAIR OF WALLS OF VERTICAL STEEL TANK MADE BY ROLLING | 2015 |
|
RU2584709C1 |
METHOD OF RESTORING DESIGN ATTITUTE OF TANK ERECTED ON GROUND FOUNDATION | 0 |
|
SU715756A1 |
Authors
Dates
2005-07-20—Published
2002-09-09—Filed