FIELD: construction.
SUBSTANCE: along the perimeter of the reservoir walls, vertical stiffeners and horizontal ties are welded. Abutments are welded to the lower butts of the vertical stiffeners. Two mutually perpendicular internal stiffeners are welded from the inside of the reservoir to the bottom. With the help of jacks, the reservoir is raised and fixed in the horizontal position, and in the center inside the reservoir a guide rack from a metal pipe is installed, into which a centering rack is inserted. Based on the reservoir bottom perimeter, an annular formwork is made, and a gap between the design mark of the reservoir bottom and the deformed base is filled with waterproofing composition levelled and compacted by means of the vibrating screed.
EFFECT: repair quality improvement.
3 cl, 16 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REPAIR OF BASE OF VERTICAL METAL TANKS FOR OIL PRODUCTS AND OIL | 2021 |
|
RU2756591C1 |
METHOD FOR LIFTING AND RETENTION OF VERTICAL STEEL RESERVOIR | 2015 |
|
RU2584713C1 |
REPAIR METHOD FOR METAL RESERVOIR | 2002 |
|
RU2256757C2 |
TANK | 0 |
|
SU838078A1 |
RESERVOIR CONSTRUCTION METHOD | 2004 |
|
RU2264504C1 |
LIQUEFIED NATURAL GAS STORAGE TANK | 2024 |
|
RU2824699C1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
MULTI-PURPOSE BUILDING | 2007 |
|
RU2345200C2 |
ERECTION METHOD FOR FORMING RESERVOIR WITH DOME-LIKE ROOF IN TOP-DOWN CONSTRUCTION MANNER AND DEVICE FOR ERECTION METHOD IMPLEMENTATION | 2003 |
|
RU2259453C2 |
MULTI-PURPOSE CONSTRUCTION FACILITY INCLUDING SEAQUARIUM AND GROUP OF SHOPPING AND ENTERTAINMENT FACILITIES | 2007 |
|
RU2347050C2 |
Authors
Dates
2017-07-28—Published
2016-03-03—Filed