FIELD: mining industry, particularly for developing potash fields located under water-bearing horizons.
SUBSTANCE: method involves performing detailed geological description of anomalous zone during anomalous zone opening by excavation thereof; investigating the zone with the use of electrical and seismic methods and determining risk level of the anomalous zone; developing system and frequency of geophysical monitoring investigations. After initiating of roof sheeting and caving in side wall of mine excavated in anomalous zone along upper developing stratum one may drill horizontal boreholes having 1m length. Distance between boreholes depends on degree and level of anomalous zone danger and vary from 10 to 100 m. Temperature gauges used to measure saliferous rock temperature are installed in bottomhole zone. Temperature reduction for 10-20% indicates that cold underground water from upper water-bearing horizons enters into salt layer and salts began to dissolve in water. If above effect took place area of above process location and configuration of the area are determined and preparation for performing necessary works to liquidate salt water appearance in mine are begun.
EFFECT: increased control precision.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MONITORING CONDITION OF WATERPROOF STRATUMS AT POTASSIUM SALT DEPOSITS | 2006 |
|
RU2300789C1 |
METHOD FOR HYDROGEOLOGICAL ZONING OF MINE FIELDS OF POTASSIUM PRODUCING ENTERPRISES | 2003 |
|
RU2261330C2 |
METHOD OF PREVENTION OF FLOODING OF POTASSIUM MINES AND HAZARDOUS DEFORMATIONS OF EARTH SURFACE AT UNDERGROUND WATER INRUSH INTO MINES | 2007 |
|
RU2341658C1 |
METHOD FOR PREVENTING FLOODING OF POTASSIUM MINES | 1997 |
|
RU2133342C1 |
METHOD OF DEVELOPING FLOODED DEPOSITS OF WATER-SOLUBLE MINERALS | 1999 |
|
RU2164601C1 |
PROCEDURE TO FORESTALL EMERGENCY SITUATION IN POTASSIUM MINES BY GEOPHYSICAL METHODS | 2000 |
|
RU2175140C1 |
METHOD OF PREVENTING FLOODING OF POTASH MINE OVER REEF ARRAY | 2016 |
|
RU2642610C1 |
METHOD FOR FILLING OF MINED-OUT SPACE DURING DEVELOPMENT OF GENTLY SLOPING BEDS WITH LONG PILLARS | 2020 |
|
RU2735173C1 |
METHOD FOR POTASSIUM MINE PROTECTION AGAINST FLOODING | 2004 |
|
RU2273734C1 |
METHOD FOR EXTRACTING DEPOSITS OF WATER-SOLUBLE MINERAL RESOURCES | 2004 |
|
RU2254471C1 |
Authors
Dates
2005-07-27—Published
2004-01-20—Filed