FIELD: mining industry, particularly for waste disposal.
SUBSTANCE: method involves drilling intake wells at brine level for pumping industrial waste in the wells; additionally drilling prospecting and evaluation boreholes; choosing area with the highest accumulation properties; drilling observation boreholes, wherein some observation boreholes are bored at upper fresh water levels to determine degree of industrial waste spread in plane; performing laboratory research to determine chemical compatibility of industrial waste with formation brine and water-bearing rock; carrying out pilot industrial waste pimping; calculating hydrogeological parameters of accumulating formation, namely capacity thereof, injectivity of accumulating level and intake well productivity; performing pumping industrial waste in the wells in necessary amounts.
EFFECT: prevention of underground water pollution.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF UNDERGROUND BURIAL OF POTASSIUM PLANT EXCESSIVE BRINES | 2000 |
|
RU2188955C2 |
METHOD FOR UTILIZATION OF INDUSTRIAL EFFECTS OF AN ENTERPRISE IN THE CONDITIONS OF CRYOLITHOZONE | 2022 |
|
RU2790345C1 |
METHOD OF UNDERGROUND DISPOSAL OF BIOHAZARDOUS WASTE WATER | 2010 |
|
RU2475874C2 |
PROCESS OF UNDERGROUND DISPOSAL OF BIOLOGICALLY HAZARDOUS SEWAGE | 2006 |
|
RU2328784C1 |
METHOD OF MONITORING THE BURYING OF INDUSTRIAL EFFLUENTS | 0 |
|
SU1162950A1 |
METHOD FOR BURIAL OF LIQUID WASTES | 2018 |
|
RU2710155C2 |
METHOD FOR PREVENTING FLOODING OF POTASSIUM MINES | 1997 |
|
RU2133342C1 |
METHOD OF BURYING OF LIQUID INDUSTRIAL WASTES | 1992 |
|
RU2039686C1 |
METHOD OF CHECKING BURIAL OF DRAIN WATERS IN PERMAFROST | 1994 |
|
RU2061635C1 |
METHOD OF CONTROL OVER STRESSED STATE OF SEISMIC REGION | 1998 |
|
RU2150721C1 |
Authors
Dates
2005-07-27—Published
2003-08-27—Filed