FIELD: oil production, particularly vibration generating arrangements for boreholes or wells for stimulating production.
SUBSTANCE: method involves applying impacts to oil reservoir by falling bottomhole tool simultaneously with oil recovery from stimulating well. Bottomhole tool lifting is performed when recovered product flow pressure in area between lifting device and anvil is less than bubble-point pressure. Gas-and liquid mixture is extracted after lifting device by immersed pump with gas separator or by immersed pump-ejector system including immersed pump, gas separator and jet device with check valve installed at inlet thereof or by water-jet pump with check valve at inlet thereof or by gas-lift assembly.
EFFECT: increased efficiency due to increased speed of bottomhole tool falling, increased frequency and power of impacts applied to oil reservoir.
15 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
FACILITY EXERTING VIBRATOR SEISMIC ACTION ON DEPOSIT THROUGH INJECTION WELL | 2003 |
|
RU2258127C1 |
METHOD AND DEVICE TO APPLY VIBRATOR SEISMIC ACTION TO OIL POOL | 2003 |
|
RU2258128C1 |
METHOD AND PLANT FOR VIBROSEISMIC STIMULATION OF OIL POOL | 2001 |
|
RU2206729C2 |
TECHNIQUE AND INSTALLATION TO HIT STRATUM WITH STRIKES | 1999 |
|
RU2164287C1 |
PLANT FOR VIBRATION AND SEISMIC ACTION ON OIL POOL | 1999 |
|
RU2164286C1 |
IMMERSED PUMP-EJECTOR SYSTEM FOR EXTRACTING OIL | 2005 |
|
RU2295631C1 |
METHOD FOR AFFECTING BOTTOMHOLE WELL ZONE | 2006 |
|
RU2327862C1 |
DEVICE FOR EFFECTING BOTTOMHOLE ZONE | 2006 |
|
RU2327854C1 |
INSTALLATION FOR VIBROSEISMIC IMPACT ON DEPOSIT | 2012 |
|
RU2515623C1 |
METHOD FOR EXTRACTING OIL AND PUMP-EJECTOR SYSTEM FOR ITS REALIZATION | 2003 |
|
RU2238443C1 |
Authors
Dates
2005-08-10—Published
2003-12-16—Filed