FIELD: oil production industry, particularly to obtain hard to recover oil reserves, mainly for carbonate reservoirs of nonuniformly saturated laminated stratums.
SUBSTANCE: method involves installing mast for swabbing on landing flange with the use of bolt connection with choosing height thereof of 3-4 m before downhole work initiation; successive grouping swabbed wells in dependence of obtained results after downhole work completion; operating wells in which output was increased or recovered in prior mode, namely in mechanized one, with bore-hole pump usage. Wells in which high output is obtained due to swabbing are operated under swabbing conditions. Wells in which output did not increase are operated with the swab usage by alternating product accumulation cycle with cycle of product pumping from well.
EFFECT: increased efficiency due acting on stratum by swabbing thereof with taking under consideration well conditions.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
BOTTOM-HOLE ZONE CHARACTERISTICS DETERMINING SYSTEM IN STRIPPED WELLS | 2014 |
|
RU2605972C2 |
EXPRESS METHOD TO DETERMINE CHARACTERISTICS OF BOTTOMHOLE ZONE IN STRIPPED WELLS USED FOR WELL COMPLETION AND SYSTEM FOR ITS IMPLEMENTATION | 2014 |
|
RU2559247C1 |
PLANT FOR MARGINAL WELL SWABBING | 2003 |
|
RU2264534C2 |
OIL WELL SWABBING METHOD | 2004 |
|
RU2270912C1 |
METHOD FOR INCREASING WELL PRODUCTION | 2006 |
|
RU2332559C2 |
METHOD FOR SHORT-TERM OPERATION OF WELL USING IMMERSED PUMP DEVICE WITH ELECTRIC DRIVE | 2005 |
|
RU2293176C1 |
METHOD FOR PERIODIC OPERATION OF OIL WELLS BY SUCKER-ROD PUMP PLANT IN SELF-TUNING MODE | 2019 |
|
RU2718444C1 |
METHOD OF OIL WELL OPERATION | 2016 |
|
RU2640597C1 |
METHOD OF PERIODIC OPERATION OF MARGINAL WELLS BY DEEP-WELL PUMPING UNIT | 2001 |
|
RU2193648C2 |
METHOD OF COMPLETING OIL WELL AND DEVICE FOR ITS EMBODIMENT | 2000 |
|
RU2183731C2 |
Authors
Dates
2005-08-10—Published
2004-02-18—Filed