FIELD: mining, particularly for building underground reservoirs adapted for liquid and gaseous product storage and for brine extraction through wells.
SUBSTANCE: method involves mounting coaxial outer and central suspension pipe strings with installing central pipe string bottom at underground reservoir bottom; sealing well head; supplying solvent into underground reservoir to be formed through outer suspended pipe string and displacing the resultant brine to ground surface through central pipe string. Channel for brine movement to bottom of central pipe string is formed above insoluble rock deposit present in underground reservoir between lower ends of outer and central pipe strings. Before salt dissolving process shutdown or in the case of oversized insoluble rock ingress in central pipe string bottom solvent is supplied to underground reservoir through central pipe string and brine is displaced through outer one.
EFFECT: facilitated dissolving system actuation, increased operational capabilities and prevention of bridge forming.
2 cl, 1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR INCREASING PAYLOAD VOLUME OF UNDERGROUND RESERVOIR FORMED IN SOLUBLE ROCK VIA BORE WELL | 2007 |
|
RU2384505C2 |
METHOD FOR CONSTRUCTING DOUBLE-DECK UNDERGROUND RESERVOIR IN ROCK SALT LAYER | 2023 |
|
RU2812756C1 |
DEVICE TO REMOVE RESIDUAL BRINE FROM UNDERGROUND RESERVOIR AND TO SUPPLY HARDENING AGENT | 2005 |
|
RU2309880C2 |
METHOD FOR UNDERGROUND RESERVOIR BUILDING IN ROCK SALT | 2003 |
|
RU2264965C2 |
METHOD OF CAVING THE INSOLUBLE ROCK PARTING IN CONSTRUCTION OF UNDERGROUND RESERVOIR IN SOLUBLE SALTS THROUGH BOREHOLE | 1998 |
|
RU2166081C2 |
METHOD OF CREATING UNDERGROUND STORAGE IN SOLUBLE ROCKS | 2004 |
|
RU2256596C1 |
METHOD OF AND DEVICE FOR CONSTRUCTION OF TANKS IN ROCK SALT | 2001 |
|
RU2213033C2 |
METHOD OF TIGHTNESS TESTING FOR UNDERGROUND RESERVOIR ARRANGED IN SOLUBLE ROCKS THROUGH DRILL WELL | 2010 |
|
RU2439517C1 |
METHOD OF CONSTRUCTION OF TANKS IN LIMITED-THICKNESS ROCKS SALT FORMATIONS | 2001 |
|
RU2213032C2 |
METHOD FOR CONSTRUCTING AN UNDERGROUND TUNNEL RESERVOIR IN A ROCK SALT RESERVOIR OF LIMITED CAPACITY | 2021 |
|
RU2754232C1 |
Authors
Dates
2005-09-10—Published
2003-12-25—Filed