FIELD: oil and gas producing industry. SUBSTANCE: invention relates to method of construction of tanks in rock salt deposits for keeping gas and oil products and burial of industrial waste. According to proposed method, development working is made by widening of uncased hole of well over entire location of underground tank by mechanically breaking the rock and simultaneously delivering solvent into zone breakage and lifting brine to daylight area. Then washing out of development working is carried out with delivery of solvent and pumping out brine along suspended tubing until designed volume of underground tank is formed. To implement the method device is proposed containing cutting members with reinforced cutters moving along guide engaging with drilling member and equipped with hydraulic cylinder. Cutting members are made in form of rods connected in pairs and furnished with system of channels hydraulically coupled with inner spaces of guide and drilling member. Device is easy to fold and transport inside well and to bring out to surface. EFFECT: intensification of underground tank construction process, reduced expenses. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION OF TANKS IN LIMITED-THICKNESS ROCKS SALT FORMATIONS | 2001 |
|
RU2213032C2 |
METHOD FOR UNDERGROUND RESERVOIR BUILDING IN ROCK SALT | 2003 |
|
RU2264965C2 |
METHOD FOR UNDERGROUND TUNNEL RESERVOIR BUILDING IN ROCK SALT BED HAVING LIMITED THICKNESS | 2004 |
|
RU2258652C1 |
METHOD OF FORMING RESERVOIRS IN ROCK SALT FORMATIONS AND DEVICE TO THIS END | 2011 |
|
RU2477702C2 |
METHOD FOR CONSTRUCTING DOUBLE-DECK UNDERGROUND RESERVOIR IN ROCK SALT LAYER | 2023 |
|
RU2812756C1 |
METHOD FOR CONSTRUCTING AN UNDERGROUND TUNNEL RESERVOIR IN A ROCK SALT RESERVOIR OF LIMITED CAPACITY | 2021 |
|
RU2754232C1 |
METHOD FOR CONSTRUCTING AN UNDERGROUND TUNNEL RESERVOIR IN A ROCK SALT RESERVOIR OF LIMITED CAPACITY | 2021 |
|
RU2756076C1 |
METHOD OF CREATING UNDERGROUND STORAGE IN SOLUBLE ROCKS | 2004 |
|
RU2256596C1 |
METHOD OF CAVING THE INSOLUBLE ROCK PARTING IN CONSTRUCTION OF UNDERGROUND RESERVOIR IN SOLUBLE SALTS THROUGH BOREHOLE | 1998 |
|
RU2166081C2 |
METHOD AND DEVICE FOR UNDERGROUND RESERVOIR FORMING IN ROCK SALT | 2003 |
|
RU2260116C1 |
Authors
Dates
2003-09-27—Published
2001-12-27—Filed