FIELD: liquid storage, particularly building underground reservoirs for liquid in soluble rock.
SUBSTANCE: method involves solving rock in several levels, wherein vertical preparation mine is preliminary formed before each layer solving. Natural gas is used as nonsolvent. Gas-brine interface is provided and maintained above top of level to be developed and natural gas is injected in vertical preparation mine. Then interface border is lowered to above top or below it. After level development the interface is increased and maintained above top of next upper level to be developed. All above operations are repeated at the next level.
EFFECT: reduced time of reservoir building and increased reliability.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERGROUND TUNNEL RESERVOIR BUILDING IN ROCK SALT BED HAVING LIMITED THICKNESS | 2004 |
|
RU2258652C1 |
METHOD OF CREATING UNDERGROUND STORAGE IN SOLUBLE ROCKS | 2004 |
|
RU2256596C1 |
METHOD FOR CONSTRUCTING AN UNDERGROUND TUNNEL RESERVOIR IN A ROCK SALT RESERVOIR OF LIMITED CAPACITY | 2021 |
|
RU2754232C1 |
METHOD OF CONSTRUCTION OF TANKS IN LIMITED-THICKNESS ROCKS SALT FORMATIONS | 2001 |
|
RU2213032C2 |
METHOD FOR CONSTRUCTING AN UNDERGROUND TUNNEL RESERVOIR IN A ROCK SALT RESERVOIR OF LIMITED CAPACITY | 2021 |
|
RU2756076C1 |
METHOD FOR CONSTRUCTING DOUBLE-DECK UNDERGROUND RESERVOIR IN ROCK SALT LAYER | 2023 |
|
RU2812756C1 |
METHOD FOR MINING DEPOSITS OF SOLUBLE ROCKS OCCURRING UNDER BEDS OF LESS SOLUBLE ROCKS | 1992 |
|
RU2042586C1 |
METHOD FOR CONSTRUCTING AN UNDERGROUND TUNNEL RESERVOIR IN A SUITE OF ROCK SALT FORMATIONS OF LIMITED CAPACITY | 2021 |
|
RU2776441C1 |
PROCEDURE FOR INCREASING PAYLOAD VOLUME OF UNDERGROUND RESERVOIR FORMED IN SOLUBLE ROCK VIA BORE WELL | 2007 |
|
RU2384505C2 |
METHOD OF FORMING RESERVOIRS IN ROCK SALT FORMATIONS AND DEVICE TO THIS END | 2011 |
|
RU2477702C2 |
Authors
Dates
2005-11-27—Published
2003-12-23—Filed