FIELD: oil and building industries, particularly for well completion.
SUBSTANCE: method involves high-pressure cementing previously perforated intervals and installing cement bridge inside well so that new false bottom is created above perforation intervals; drilling inclined borehole from level located above upper perforation interval; driving casing pipe into the borehole; separating inner space of casing pipe into upper and lower volumes in zone above producing formation top; communicating upper volume with annular space above producing formation top; communicating lower volume with annular space within the boundaries of producing formation; eliminating liquid flow from annular space into upper volume; pumping cement mortar through upper volume into casing string-borehole annuity above producing formation top; curing cement for setting and hardening thereof; communicating upper and lower volumes and providing liquid flow through casing string interior.
EFFECT: increased well output due to prevention of mudding influence from cement on bottom hole formation zone, maintaining of necessary well diameter within the boundaries of producing formation.
1 ex, 1 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| PROCEDURE FOR COMPLETION OF STRIPPER WELL | 2015 | 
 | RU2586337C1 | 
| COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 | 
 | RU2793351C1 | 
| METHOD OF GAS WELL COMPLETION | 2013 | 
 | RU2534548C1 | 
| METHOD OF WELL COMPLETION | 2002 | 
 | RU2209941C1 | 
| METHOD OF INJECTING INTO WELLS | 1994 | 
 | RU2109128C1 | 
| METHOD OF OIL DEPOSIT DEVELOPMENT | 2008 | 
 | RU2369724C1 | 
| PROCEDURE FOR CONSTRUCTION OF WELLS OF MULTI-PAY OIL FIELD | 2010 | 
 | RU2427703C1 | 
| WELL CEMENTING METHOD UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2021 | 
 | RU2775319C1 | 
| METHOD OF MULTILATERAL WELL CONSTRUCTION | 2016 | 
 | RU2650161C2 | 
| WELL COMPLETION METHOD | 2023 | 
 | RU2795281C1 | 
Authors
Dates
2005-06-10—Published
2004-08-05—Filed