FIELD: oil and building industries, particularly for well completion.
SUBSTANCE: method involves high-pressure cementing previously perforated intervals and installing cement bridge inside well so that new false bottom is created above perforation intervals; drilling inclined borehole from level located above upper perforation interval; driving casing pipe into the borehole; separating inner space of casing pipe into upper and lower volumes in zone above producing formation top; communicating upper volume with annular space above producing formation top; communicating lower volume with annular space within the boundaries of producing formation; eliminating liquid flow from annular space into upper volume; pumping cement mortar through upper volume into casing string-borehole annuity above producing formation top; curing cement for setting and hardening thereof; communicating upper and lower volumes and providing liquid flow through casing string interior.
EFFECT: increased well output due to prevention of mudding influence from cement on bottom hole formation zone, maintaining of necessary well diameter within the boundaries of producing formation.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR COMPLETION OF STRIPPER WELL | 2015 |
|
RU2586337C1 |
COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 |
|
RU2793351C1 |
METHOD OF GAS WELL COMPLETION | 2013 |
|
RU2534548C1 |
METHOD OF WELL COMPLETION | 2002 |
|
RU2209941C1 |
METHOD OF INJECTING INTO WELLS | 1994 |
|
RU2109128C1 |
PROCEDURE FOR CONSTRUCTION OF WELLS OF MULTI-PAY OIL FIELD | 2010 |
|
RU2427703C1 |
WELL CEMENTING METHOD UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2021 |
|
RU2775319C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2008 |
|
RU2369724C1 |
METHOD OF MULTILATERAL WELL CONSTRUCTION | 2016 |
|
RU2650161C2 |
WELL COMPLETION METHOD | 2023 |
|
RU2795281C1 |
Authors
Dates
2005-06-10—Published
2004-08-05—Filed