FIELD: mining industry, particularly methods of underground or surface mining.
SUBSTANCE: method involves performing opencast mining; performing underground preparation and cutting workings; excavating mineral in breakage face; transporting the mineral to day surface in open pits; installing cutting-off support along pillar to be excavated in worked out space at day surface as breakage face moves forward; forming rubble band with waterproofing layer at day surface, wherein rubble band width B is determined as B≥5m, where m is mineral deposit thickness.
EFFECT: provision of efficient mine venting, prevention of flooding thereof with rain water.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BEDDED DEPOSIT DEVELOPMENT | 2006 |
|
RU2343284C2 |
METHOD OF FULL DEVELOPMENT OF GENTLY SLOPING COAL BEDS WITH POWER-DRIVEN SYSTEMS WITHOUT ANY PREPARATORY MINE WORKINGS | 2010 |
|
RU2444624C1 |
METHOD FOR DEVELOPMENT OF MINE FIELD IN MINING MINERAL BEDS AT LARGE DEPTHS | 1994 |
|
RU2069754C1 |
ROOF CONTROL METHOD | 2005 |
|
RU2283958C1 |
METHOD TO SAFEGUARD DEVELOPMENT OPENINGS | 2010 |
|
RU2441164C1 |
METHOD TO CONTROL HARD-CAVING ROOF | 2007 |
|
RU2325528C1 |
METHOD FOR CONTROLLING HARD-DESTRUCTIBLE CEILING | 2003 |
|
RU2246618C1 |
GENTLY SLOPING COAL BED MINING METHOD | 2005 |
|
RU2284414C1 |
CEILING CONTROL METHOD | 2004 |
|
RU2254479C1 |
METHOD OF COMBINED MINING OF SERIES OF CONTIGUOUS BEDS | 2001 |
|
RU2211331C2 |
Authors
Dates
2005-12-10—Published
2003-12-02—Filed