FIELD: mining, particularly to control rock pressure during underground flat-laying mineral seam development.
SUBSTANCE: method involves erecting rubble pile rows in parallel to stope line, wherein rubble pile rows are spaced apart a distance less than roof rock caving pitch; laying pneumatic cylinders of rubble pile gob; filling the pneumatic cylinders with compressed air so that the pneumatic cylinders are expanded between roof rock and gob; unloading pneumatic cylinders after roof rock lowering on timber structure of rubble piles and removing pneumatic cylinders. Rubble pile widths exceed that of pneumatic cylinders. Rubble pile gob height is determined from h=mf-(hc+Δ), m, where mf is formation thickness, hc is collapsed pneumatic cylinder height and Δ is collapsed pneumatic cylinder height tolerance.
EFFECT: increased efficiency of roof control in stope goaf.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
ROOF CONTROL METHOD | 2005 |
|
RU2298100C1 |
DEVELOPMENT METHOD FOR COMPOSITE SEAMS CHARACTERIZED BY GOB LAYERS | 2005 |
|
RU2276265C1 |
DEVELOPMENT METHOD OF COMPOSITE BEDS WITH WASTE ROCK INTERLAYERS | 2007 |
|
RU2345218C1 |
MINING METHOD FOR COMPLEX SEAMS HAVING GOB INTERLAYERS | 2006 |
|
RU2309251C1 |
METHOD TO SAFEGUARD DEVELOPMENT OPENINGS | 2010 |
|
RU2441164C1 |
METHOD FOR COMPOSITE FORMATIONS HAVING GOB LAYERS DEVELOPMENT | 2005 |
|
RU2281394C1 |
DEVELOPMENT METHOD FOR COMPOSITE FORMATIONS HAVING GOB INTERLAYERS | 2005 |
|
RU2277170C1 |
METHOD FOR ROOF CONTROL WITH BLOCKS ON PLIABLE SUPPORT | 1997 |
|
RU2138642C1 |
CEILING CONTROL METHOD | 2004 |
|
RU2254479C1 |
UNDERGROUND MINING METHOD OF FLAT BEDS OF MINERAL RESOURCES | 2007 |
|
RU2345220C1 |
Authors
Dates
2006-09-20—Published
2005-05-23—Filed