FIELD: mining industry.
SUBSTANCE: method includes partial filling of extracted space of side and central mains by filling stripes from lava extracting shafts. At center of semi-lava on the side of massive, wherein next extractive column will be cut, filling shaft is additionally driven, wherefrom full filling of space between central fill stripe and fill stripe on the side of massive is performed. Preparation of next extraction column is performed under protection of erected fill stripes.
EFFECT: higher safety, higher efficiency.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO CONTROL HARD-CAVING ROOF | 2007 |
|
RU2325528C1 |
METHOD OF CONTROLLING DIFFICULT-TO-CAVE ROOF | 2000 |
|
RU2177546C1 |
METHOD FOR FILLING OF MINED-OUT SPACE DURING DEVELOPMENT OF GENTLY SLOPING BEDS WITH LONG PILLARS | 2020 |
|
RU2735173C1 |
METHOD TO SAFEGUARD DEVELOPMENT OPENINGS | 2010 |
|
RU2441164C1 |
PROCESS OF DEVELOPMENT OF THICK GENTLY DIPPING COAL FORMATIONS WITH ROOF ROCKS DIFFICULT TO FALL | 2002 |
|
RU2219341C1 |
METHOD TO DEVELOP POTASSIUM BEDS | 2009 |
|
RU2412351C1 |
METHOD OF CONTROLLING ROCK PRESSURE WHEN WORKING GENTLY-SLOPING COAL SEAMS | 0 |
|
SU1081358A1 |
PROCESS OF EXPLOITATION OF THICK GAS-BEARING GENTLY DIPPING SEAMS | 1993 |
|
RU2057934C1 |
ROOF CONTROL METHOD | 2005 |
|
RU2283958C1 |
CONTROL METHOD OF POORLY CAVING ROOF AT MINING OF GAS-BEARING FORMATIONS IN FACES WITH MECHANISED COMPLEXES | 2011 |
|
RU2472931C1 |
Authors
Dates
2005-02-20—Published
2003-12-08—Filed