FIELD: mining industry, particularly to form venting system, which controls thermal mine conditions during combined mining.
SUBSTANCE: method involves forming overburden haulage inclined out of the pit extending across the strike up to interface between exposed and underground mines; extracting mineral from the haulage; constructing venting means and mounting support in approach mine; erecting heat-exchanging mines during opened mining.
EFFECT: elimination of time intervals during venting system construction and mining performing, simplified people evacuation in emergency and possibility to use heat-exchanging mines for other purposes.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COMBINED MINING OF BEDDED MINERAL DEPOSITS | 2001 |
|
RU2194858C2 |
METHOD FOR OPEN-UNDERGROUND EXTRACTION OF DEPOSITS | 2002 |
|
RU2238406C2 |
METHOD FOR OPEN-UNDERGROUND DEVELOPMENT OF FLAT-LYING FORMATIONS | 2019 |
|
RU2715503C1 |
METHOD OF UNDERGROUND MINING OF MINERAL BEDDED DEPOSITS | 1997 |
|
RU2120551C1 |
COMPOUND DEVELOPMENT METHOD OF SERIES OF GENTLY SLOPING BEDS OF MINE FIELDS | 2009 |
|
RU2418166C1 |
METHOD OF UNDERGROUND MINING OF MINERAL SHEET DEPOSITS | 2000 |
|
RU2183272C2 |
METHOD OF MINING OF MINERAL UPPER HORIZONS | 1993 |
|
RU2091583C1 |
OPEN-UNDERGROUND METHOD OF BEDDED DEPOSITS MINING | 2010 |
|
RU2439321C1 |
COMPLEX METHOD FOR EXTRACTING MINERAL RESOURCE DEPOSITS | 2005 |
|
RU2295036C2 |
OPEN-UNDERGROUND METHOD OF DEVELOPMENT OF STRATIFIED DEPOSITS OF MINERALS | 2019 |
|
RU2733759C1 |
Authors
Dates
2005-12-10—Published
2004-04-08—Filed